Skip to main content

SESA deploys dynamic Trailblazer signs for Michigan DOT

SES America (SESA) recently completed the manufacture and installation of full colour LED dynamic Trailblazer signs for the Michigan Department of Transportation and is set to soon begin manufacturing of additional signs for the next phase of this ongoing work. The signs are part of integrated corridor management along I-75 designed by the Michigan Department of Transportation. Each sign is part of SESA’s Messenger 5000 embedded DMS series, a line of embedded DMS designed to display travel time, toll rate,
May 6, 2016 Read time: 2 mins

7846 SES America (SESA) recently completed the manufacture and installation of full colour LED dynamic Trailblazer signs for the Michigan Department of Transportation and is set to soon begin manufacturing of additional signs for the next phase of this ongoing work.

The signs are part of integrated corridor management along I-75 designed by the Michigan Department of Transportation. Each sign is part of SESA’s Messenger 5000 embedded DMS series, a line of embedded DMS designed to display travel time, toll rate, lane status or traffic control information.

As part of this project, the embedded DMS is intended to divert and manage the influx of traffic, and reduce traffic queues and congestion on freeways for both Macomber and Oakland counties. The signs feature a full colour display capable of showing a variety of arrows that re-direct traffic as necessary on to surface roads and alternate routes. The signs are controlled by SESA’s state-of-the-art NTCIP-compliant SCU6 controller housed in field cabinets near each site. Each sign is placed at strategic locations and display the indicative arrow only when needed.

According to SESA, this combination of static sign and embedded dynamic display is cost effective, advantageously replacing an entire full colour/full matrix DMS.

For the first deployment, energy-efficient technology was utilised to minimize the quantity and size of command, control, and power components, enabling the components to be installed in a small NEMA 4X cabinet attached to each sign structure for the initial deployment. This design was refined for the subsequent deployment, allowing all components to be installed within the sign itself, while maintaining the slim sign housing design required for the project.

For more information on companies in this article

Related Content

  • Machine vision needs standards to fulfil ITS demands
    May 28, 2014
    No-one should expect the enabling qualities of machine vision to come free of charge but Jason Barnes finds there is still much that ITS stakeholders can do to help reduce costs. After many years of application in high-end solutions for the enforcement and tolling sectors, machine vision is gaining traction in more general areas of traffic management. Nevertheless, those OEMs producing transport-oriented solutions which incorporate machine vision and looking to increase the technology’s share of the ITS mar
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • Oklahoma DOT opts for IRD WIM screening system
    May 29, 2015
    Oklahoma Department of Transportation (ODOT) has awarded International Road Dynamics (IRD) a US$2.54 million project to build, implement, and maintain a new and innovative port-of-entry (POE) electronic screening system (ESS) for commercial vehicles at Interstate-40 westbound, Sequoyah County, Oklahoma. This contract includes the supply and installation of IRD's weigh-in-motion (WIM) and intelligent roadside operation credentialing (iROC) system utilising license plate reader (LPR) and USDOT reader technolo
  • SES America webinar - integrated solar power in dynamic travel time systems
    April 23, 2015
    SES America is offering an ITS engineering webinar on 30 April at 1000 central time. The webinar focuses on a state-wide project exploring the developmental stages and lessons learned on the first phase with the changes to be implemented on the final execution. The webinar will provide information on: Building a reliable solar power system with proper specifications; essentials of solar power design for utilisation on any ITS device; site evaluation and sign design; and lessons learned - the dos and don'ts