Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

Related Content

  • Australian ITS Summit combines with NeTC
    April 30, 2015
    For the first time, the Australian ITS Summit and the National electronic Tolling Conference (NeTC), which takes place on 12-14 May in Melbourne, will combine as the most important gathering in Australia for ITS professionals in 2015. To be opened by Minister Luke Donnellan, Minister for Roads and Road Safety and Minister for Ports, the conference will bring together transportation engineers, manufacturers, consultants, business leaders, academia and government to hear about best practices, trends and em
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • Adaptive control reduces travel time, cuts congestion
    January 20, 2012
    Situated in San Diego County, California, the growing city of San Marcos has seen its population increase by 53.5 per cent since the turn of the century. Although this dramatic population increase has spurred economic growth bringing new business, homes and opportunities to the city, it has also increased traffic congestion along its central corridor, San Marcos Boulevard. This became the most congested arterial in the city, and, by 2006, the second-most travelled corridor in San Diego County.
  • Key airport link open in US
    May 17, 2012
    The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor