Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

Related Content

  • February 11, 2013
    Visionstream secures Australian motorways project
    Visionstream Australia (Visionstream) is to deliver the Intelligent Transport System (ITS) and communications infrastructure for the Westgate Freeway Managed Motorway Project under the National Smart Managed Motorways Program. The US$21.5 million contract includes design and construction of the ITS system and an operations and maintenance component for two years. Under the contract, Visionstream will be undertaking the design, supply, installation and integration of ITS devices including lane use signs, va
  • December 19, 2016
    Australia to trial autonomous vehicles on public roads
    Australia’s Victorian government is to begin a trial to look at how automated vehicles can interact with Australian road infrastructure. VicRoads will work with industry to seek feedback on the government’s Future Directions Paper, which outlines the need for regulatory changes to allow testing of highly automated vehicles on public roads. The consultation will focus on how to ensure road safety during testing on public roads, what constitutes a driver ‘being in control’ and understanding how the changi
  • April 18, 2016
    Victorian Government to fund second river crossing
    The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
  • May 14, 2013
    Intelligent Transport System for Australia's Monash Freeway
    Sluggish peak-hour traffic on Melbourne's busiest road, the Monash Freeway, will flow about 20 km/h faster when new technology is introduced, thanks to a US$78.2 million cash injection from the Australian Government to help improve traffic flow, with the money to go towards installing and upgrading intelligent transport systems on a 34.5-kilometre stretch of the road in Melbourne's east. The commitment is intended to be matched by the Victorian government and will go towards technology such as variable spee