Skip to main content

Tullamarine freeway upgrade ‘to cut airport run by up to 20 minutes’

A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled. Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project. The Australian and Victorian Governments and Transurban will jointly fund the project, which also inc
May 1, 2015 Read time: 2 mins
A US$1 billion project, which will add 24 kilometres of extra lanes to one of Victoria’s busiest and most important roads and reduce congestion and travel time to Melbourne airport, is set to be unveiled.

Minister for Roads and Road Safety, Luke Donnellan, has announced that the Victorian Government and 600 Transurban had signed a new, robust agreement to deliver the CityLink Tullamarine Widening Project.

The Australian and Victorian Governments and Transurban will jointly fund the project, which also includes a new bridge over the freeway at Bell St, major improvements to the English Street interchange and the widening of the entry ramp from the Bolte Bridge to the West Gate Freeway.

The CityLink-Tullamarine corridor is one of the most heavily congested roads in Melbourne with 210,000 vehicles using the road a day. The installation of a freeway management system, including modern technology such as ramp signalling and variable message signs, is intended to reduce the congestion while making the roads safer for the large volume of motorists.

The project will be delivered in two sections, with Melbourne Airport to Bulla Road managed by 4728 VicRoads and Bulla Road to Power Street managed by Transurban. The expanded agreement will also mean less disruption for motorists, with major works confined to night periods.

Major construction will start in October 2015 and is due for completion in 2018.

Related Content

  • August 11, 2017
    Victoria trials automated vehicles
    An automated vehicle trial is underway on the Monash-CityLink-Tullamarine corridor to help Victoria, Australia, prepare for the future of driverless vehicles. The Government is partnering with VicRoads, RACV and Transurban, to trial connected and automated vehicles from manufacturers BMW, Mercedes, Tesla and Volvo. The study will look at how to prepare road infrastructure, regulations and the community for the integration of this new technology into our transport system.
  • October 21, 2020
    Vitronic Australia wins CityLink toll upgrade
    Manufacturer will supply video and DSRC tech to Melbourne's arterial 22km route
  • February 12, 2015
    Framework for trialling road freight ITS begins in Australia
    The Victoria Government in Australia is sponsoring a new framework to trial technology on the state’s road network that will improve the operation of heavy vehicles and promote Victoria as Australia’s freight and logistics capital. Minister for Roads, Luke Donnellan, called on the heavy vehicle, freight and Intelligent Transport Systems (ITS) industries to develop innovative approaches to using intelligent transportation systems (ITS) and associated technology to improve the productivity and safety of ro
  • December 6, 2012
    New Port Mann Bridge opens to eight lanes of traffic
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin