Skip to main content

Project to ease traffic on Interstate 80 unveiled

California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.
October 29, 2012 Read time: 3 mins
California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.

An unprecedented collaboration that includes 3879 Caltrans, the 343 Metropolitan Transportation Commission, the transportation commissions in Alameda and Contra Costa counties and cities along the corridor has rolled out plans for the I-80 Integrated Corridor Mobility Project.

The US$80 million project is "a state-of-the-art technological solution to managing congestion and improving traffic conditions," Art Dao, executive director of the Alameda County Transportation Commission, said at the ceremony in Emeryville. A few yards from the groundbreaking event, traffic moved toward the maze at its usual crawl.

Officials plan to alleviate that condition with a multi-pronged and integrated high-tech approach that will give drivers real-time information about conditions on the freeway and San Pablo Avenue, as well as managing the flow of cars approaching freeway entrances.

A new type of adaptive metering light to be installed at all of the corridor's 40 on-ramps will allow entrance at rates determined by the current flow of traffic. Buses will have priority for entrance, using a transponder to turn the light green.

The freeway itself will have detectors to accurately monitor traffic; new signs on I-80 and San Pablo and other major connectors will inform motorists of current conditions, blocked lanes, speed recommendations and alternative routes; and updates will be available via car radio announcements.

The unusual cross-county collaboration, which involves some 19 agencies and jurisdictions, was created because the corridor is important to the region's economy, officials said. The freeway logs 7,500 hours of delays each day, including freight traffic coming to and from the Port of Oakland.

Such delays are costly financially and in terms of air quality, particularly as traffic spills over or backs up onto the streets of cities along the corridor. Without a change, conditions will only worsen, officials said.

Conditions also delay responses to accidents, breakdowns and other emergencies.
The traditional option of increasing capacity by widening the freeway, as was done when carpool lanes were added in recent years, was ruled out because of cost and lack of available land to expand.

"We needed something new; we needed something better," said Caltrans District 4 Director Bijan Sartipi.  The high-tech approach that was chosen is "not just new to the Bay Area," but unique in California, he added.

All the information that will be available to drivers "will help get people to the most appropriate place they need to be at that time," said El Cerrito Councilwoman Janet Abelson, who is on the West Contra Costa Transportation Advisory Committee.

Special software will manage the multiple systems, which will be controlled at the Caltrans traffic management center in Oakland.

Related Content

  • May 31, 2017
    Iteris awarded transit performance initiative project by San Francisco transit company
    Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
  • August 8, 2012
    Construction begins on $1 billion I-95 Express Lanes in Northern Virginia
    Surrounded by elected officials, transportation engineers, and dignitaries, Virginia Governor Bob McDonnell held a groundbreaking ceremony yesterday to begin construction of the I-95 Express Lanes in Northern Virginia. The project will build 29 miles (46.7kms) of express lanes on I-95 from Garrisonville Road in Stafford County to Edsall Road in Fairfax County, and will connect the I-95 Express Lanes to the I-495 Express Lanes currently under construction to provide a seamless network of new lanes to reduce
  • April 23, 2013
    Iteris announces San Mateo County (Calif.) smart corridor win at ITS America
    teris won a $580,000 contract has the final integration phase of the San Mateo Smart Corridor Program, continuing a collaboration of 13 agencies and cities to design, deploy and integrate ITS solutions and strategies along the US-101 corridor in the county.
  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was