Skip to main content

Manchester orbital route to become ‘smart motorway’

Four companies, Balfour Beatty, together with Costain, Carillion and a BAM Nuttall Morgan Sindall joint venture, have been awarded the contract to upgrade a 17 mile stretch of the M60 and M62 to a ‘smart motorway’. The US$313 million upgrade, for the UK Highways Agency, aims to increase capacity, reduce congestion and shorten journey times for motorists. The M60 between junctions 8 and 12 will be upgraded to a controlled motorway with traffic flows managed by technology interventions responsive to the
June 19, 2014 Read time: 2 mins
Four companies, 3902 Balfour Beatty, together with 2002 Costain, 7813 Carillion, 7815 BAM Nuttall and 7814 Morgan Sindall joint venture, have been awarded the contract to upgrade a 17 mile stretch of the M60 and M62 to a ‘Smart motorway’.

The US$313 million upgrade, for the 1841 UK Highways Agency, aims to increase capacity, reduce congestion and shorten journey times for motorists.

The M60 between junctions 8 and 12 will be upgraded to a controlled motorway with traffic flows managed by technology interventions responsive to the volume of traffic on the network.  The M62 between junctions 18 and 20 will become a four-lane, all-lane running motorway by adapting the hard shoulder for continuous use and using electronic signs to manage traffic flows.

Balfour Beatty executive chairman, Steve Marshall said:  “We have been working with the Highways Agency for twenty years and look forward to building on that successful relationship.  This scheme will benefit the 180,000 road users that pass through this section of the motorway network every day. We are committed to lead this project in a collaborative way with our partners, employing local people and businesses in our supply chain.”

Related Content

  • April 11, 2014
    M25 becomes UK’s smartest motorway
    Final preparations are taking place for the M25 to become England’s first smart motorway, improving journeys and boosting the economy. Two sections of the motorway opening this month and next are between junctions 23 and 25 in Hertfordshire and between junctions 5 and 6/7 on the Kent/Surrey border. For the first time on a motorway scheme in England the hard shoulder will be used as a permanent traffic lane, with enhanced technology to manage traffic flow to improve the reliability of journey times.
  • June 1, 2015
    Fluor JV to build Texas expressway
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • January 15, 2014
    South west’s first smart motorway opens
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • April 14, 2015
    IAM calls for greater education for smart motorway users
    As smart motorways reach their first birthday in the UK this week, the Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion still exists amongst motorway users on how best to use them. Smart motorways were officially introduced this time last year to replace Managed Motorways as the solution to the nation’s congested motorways but concerns have been raised over their safety. England’s first all-lane running motorway, i.e. without a hard shoulder, opened on the 2.5 km