Skip to main content

Balfour Beatty JV to deliver UK smart motorways package

The Balfour Beatty Vinci joint venture has been awarded a contract by Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme. The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshir
July 22, 2015 Read time: 2 mins
The 3902 Balfour Beatty 5176 Vinci joint venture has been awarded a contract by 8101 Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme.

The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshire.

These upgrades are aimed at increasing capacity, reducing congestion and shortening journey times for the thousands of road users who use these parts of the network every day. Extra capacity will be added to the motorways through the conversion of the hard shoulder to a permanent running lane. Electronic signs, operated by a regional control centre, will be installed to manage the flow of traffic in response to driving conditions.

Work on the M5 upgrade is due to start in the autumn of this year. Subject to statutory approval and continued value for money, the M6 is expected to start work in 2017/18 and the M4 scheme in 2016/17. Final target costs for these contracts will be agreed with Highways England.

Related Content

  • January 12, 2022
    UK ‘pauses’ smart motorway roll-out
    All-lane running motorway schemes to be halted until five years' safety data is available
  • October 30, 2014
    UK’s M3 gets smart
    Work begins shortly on the initial phase of a US$278 million project to improve the M3 between the M25 and Farnborough. The section between junctions 2 and 4a will become a smart motorway, adding a fourth lane in both directions in place of the hard shoulder and adding enhanced on-road technology to keep traffic moving safely and reliably, providing a boost for businesses and the wider economy. The road will also be resurfaced with a new, low noise material. The main works are due to be completed by the
  • June 1, 2015
    Fluor JV to build Texas expressway
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • April 14, 2015
    IAM calls for greater education for smart motorway users
    As smart motorways reach their first birthday in the UK this week, the Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion still exists amongst motorway users on how best to use them. Smart motorways were officially introduced this time last year to replace Managed Motorways as the solution to the nation’s congested motorways but concerns have been raised over their safety. England’s first all-lane running motorway, i.e. without a hard shoulder, opened on the 2.5 km