Skip to main content

Colombian highway sees ITS tested to the extreme

One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
November 13, 2014 Read time: 4 mins
A bride being constructed over the Quebrada Blanca will carry the road between tunnels 10 and 11 in section three of the new highway

One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio.

Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory. The road is the only economical way to join the eastern region of the country with Bogota, Colombia’s capital, and consequently it has the highest traffic growth in the country.

An upgrade to a segregated highway with two lanes in each direction has been planned by the National Roads Institute INVÍAS. However, the new road will have to run through 18 tunnels totalling almost 15km in length as well as across 50 bridges and viaducts with a total length of 5,228m. In some section the work is an upgrade to the existing roadway but most, including most the tunnels and bridges, is completely new green-field infrastructure.

Colombian concessionaire 7764 Coviandes Andes will manage the road and has awarded Spanish consultancy and technology firm 509 Indra a US$34m contract to design and install traffic management technology in 18 tunnels, 41 bridges and three overpasses along a particularly challenging 45km section. It is expected that more than 1,200 vehicles carrying hazardous goods (usually fuel) will use this stretch of the road each day, so the new tunnels are designed to the European EuroTAPstandards for maximum safety and efficiency. While three existing tunnels will be utilised the remaining tunnels and bridges are under construction or have been completed.

The contract also includes a new control centre at Naranjal which will house five operators and will be integrated with those at Boquerón and Buenavista to manage the traffic in the whole infrastructure. As with the existing control centres, the new one will be fitted with Indra’s Horus integrated roadway and tunnel management system which provides the operators with real-time information.

Monitoring and control systems in the tunnels are centred on 215 fixed CCTV/ machine vision cameras which detect incidents, stationary vehicles or obstacles, wrong way drivers and pedestrians. There are also individual detectors for visibility, fire and carbon monoxide. SOS posts along with communications including loudspeakers and road signage are available should an incident occur. All the tunnels will also be equipped with power generators and backup power, a lighting system and emergency evacuation routes.

Coviandes has also specified automatic incident detection systems along the full 86km between Bogota and Villavicencio including 72 pan and tilt cameras and a fourth weather station added to the three that are already deployed. There will be also variable message signs along the roadway to provide drivers with real-time information about road conditions, speed limits and incidents.

In normal operation Boquerón will remain the lead control room with the other two acting as monitors. However, all three control centres can share the control of the road and each is equipped to manage the entire road and take the lead in the event of an incident. This includes a complex radio communication system based on the transmission of the digital mobile radio signals from three mountains joined by a radio link that covers the entire length of the road.

In the event of an incident both single lane running and contraflow arrangements can be quickly implemented using either the VMS or a combination of VMS and cones. The design of the new road is such that in some sections it runs parallel to the existing road so there will be seven sections where traffic can be diverted onto and off of the old road in the event of a major incident. 

While the first section will be opened this December, it will be until July 2017 before the highway is finished and once completed it will cut the journey to about 90 minutes and reduce vehicle operating costs by up to 60%. 

For more information on companies in this article

Related Content

  • Orange County to manage traffic with trial interoperable CCTV
    September 12, 2014
    Interoperable CCTV can provide early warning of problems and help improve traffic management and incident response as Morteza Fahrtash and Carlos Ortiz explain. California’s transportation system is one of the state’s defining features and Caltrans (California Department of Transportation) strives to improving mobility across the state through the design, construction, operation and maintenance of the network of highway, freeways, toll roads and expressways.
  • TransCore to design and build I-66 active traffic management system
    February 15, 2013
    One of the most congested interstates in Virginia, US, is to get an Active Traffic Management (ATM) system. The Virginia Department of Transportation (VDOT) has selected TransCore, a division of Roper Industries, to design and build its I-66 ATM system on northern Virginia’s main highway into the District of Columbia. The US$34 million contract is 90 percent federally funded and will support thirty-four miles of highway from the District of Columbia to Gainesville US-29 in Prince William County. The projec
  • Indra to modernise CCTV surveillance for Sydney rail network
    December 14, 2015
    Sydney Trains, which provides railway services in the city of Sydney and surrounding area, has awarded Indra a contract valued at around US$52.6 million to modernise the railway network video surveillance system, using state-of-the-art technology. The project is expected to be completed within five years and includes maintenance for three years. Indra will fully equip two control centres using closed-circuit television (CCTV) in a network of over 150 commuter stations, and will install state-of-the-art o
  • IRD complements WIM with tyre under-inflation detection
    May 8, 2015
    To complement its existing WIM offering, IRD has introduced a system to detect under-inflated and flat tyres at highway speeds. Tyre inflation pressure has both safety and economic impacts for road users and none more so than with commercial vehicles. An underinflated tyre has decreased directional control, increased risk of catastrophic failure, and negatively impacts tyre life and fuel economy. In June 2014 the USDOT published Large Truck and Bus Crash Facts 2012 in which the Federal Motor Carrier Safety