Skip to main content

Indra to modernise CCTV surveillance for Sydney rail network

Sydney Trains, which provides railway services in the city of Sydney and surrounding area, has awarded Indra a contract valued at around US$52.6 million to modernise the railway network video surveillance system, using state-of-the-art technology. The project is expected to be completed within five years and includes maintenance for three years. Indra will fully equip two control centres using closed-circuit television (CCTV) in a network of over 150 commuter stations, and will install state-of-the-art o
December 14, 2015 Read time: 2 mins
Sydney Trains, which provides railway services in the city of Sydney and surrounding area, has awarded 509 Indra a contract valued at around US$52.6 million to modernise the railway network video surveillance system, using state-of-the-art technology. The project is expected to be completed within five years and includes maintenance for three years.

Indra will fully equip two control centres using closed-circuit television (CCTV) in a network of over 150 commuter stations, and will install state-of-the-art operation and control software. It will also replace the current 11,400 analog cameras with IP cameras that will be connected to the existing trunk communications network via a new network to be deployed in the stations. Indra will also supply the servers and storage devices for recording images during the period stipulated by the client.

The new system allows operators to view each camera image in real time from any computer, tablet or cell phone connected to the network.

The software also includes algorithms that continuously analyse the station camera images to automatically detect potentially dangerous incidents and automatically generates an alarm.

Related Content

  • July 20, 2015
    Indra implements smart tunnel technology
    Texeira Duarte has awarded Indra a contract for the design, installation and commissioning of intelligent traffic systems (ITS), control and communications for the Marao tunnel, currently under construction and which, spanning close to 6 km, is said to be the longest in Portugal and the Iberian Peninsula. In addition, Indra will also implement its tunnel control technology for the tunnel of the Mashhad Metro Line 2 in Iran. The global value of these contracts for Indra is more than US$8 million Indra
  • June 17, 2014
    Indra consortium awarded east-west Algeria highway contract
    A consortium led by Codiser and including Indra has been awarded a contract to build facilities and provide equipment to operate a 380 kilometre stretch of the east-west Algerian highway. The contract, awarded by L’Algerienne de Gestion des Autoroutes (AGA), the organisation responsible for managing, operating, maintaining and servicing the Algerian national highway network, covers a stretch that links the cities of Hammam El Bibane and Bou Kadir, via the country's capital Algiers, in the central sectio
  • December 20, 2013
    Indra wins big in Mexico
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ
  • June 1, 2016
    B&C Transit modernises Miami-Dade Metrorail’s control systems
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.