Virginia DoT faced a challenge common to many highway authorities around the world: the need, in economically challenging times, to replace ageing variable message signs reaching the end of their operational life. For some 25 years now, since the mid 80s, Virginia Department of Transportation (VDoT), has deployed variable message signs (VMS) as part of its motorist information systems. Throughout the state there are still many old 'flip-disk' signs. Some of the companies that provided these electronic messa
January 26, 2012 Read time: 5 mins

Virginia DoT faced a challenge common to many highway authorities around the world: the need, in economically challenging times, to replace ageing variable message signs reaching the end of their operational life

For some 25 years now, since the mid 80s, 1747 Virginia Department of Transportation (VDoT), has deployed variable message signs (VMS) as part of its motorist information systems. Throughout the state there are still many old 'flip-disk' signs. Some of the companies that provided these electronic message boards no longer support the products or have stopped manufacturing them altogether. As a result, maintenance has become increasingly difficult and costly: since parts for these signs are impossible to buy, VDoT has had to resort to cannibalising or hand repairing parts.

While many of the older VMS have been kept operational by such creative maintenance methods, VDoT recognised that even this approach was becoming unworkable. So these old signs would have to be replaced. But it is not that simple, as VDoTProject:
Virginia DoT Variable Message Sign Retrofitting programme
Cost:
$100,000 per sign approx.
Savings:
$200,000 per sign. Eventually, up to $300,000 per year savings in electrical energy and long term maintenance costs
Operations & Security Division administrator Tom Phillips explains: "A replacement VMS requires a full engineering evaluation, including determination of the condition and suitability of the support structure.

This is necessary because introducing a new VMS to existing supports introduces the possibility of overload or instability due to the change in the sign from the original design," Phillips says, adding that, in Virginia, support structures are examined in the same fashion as highway bridges for keeping in good repair.

The evaluations revealed no issues with the sign gantries - all were in good health. So VDoT could focus on just replacing the VMS units. Then it hit upon an idea: What if the existing VMS could be retrofitted with new technology while retaining the sign cases and other structural elements? This approach was explored with an evaluation process which eventually lasted a year. It began with a review and proofing of available technology and a trial of implementing new sign materials within refurbished VMS sign cases.

A site was selected that was representative of an older VMS within Virginia's Northern Region near Washington, DC. The sign was removed from the support structure and a manufacturer was selected to fabricate retrofit kits that could be installed by VDoT staff or its ITS maintenance contractor.

The company chosen to carry out the work used the existing VMS components as a template for sizing replacement modules. The resulting prototyped kit configured of the company's standard products, but fitted to bespoke sign attachment hardware specifically fabricated for the existing sign.

The VMS cabinet was refurbished in an off-site location using finishes that are designed to last for many years and give the VMS a 'like new' appearance to the travelling public.

The refurbished sign was delivered and installed back on the gantry it had been removed from, then subjected to operational tests through the regional ITS control centre's advanced traffic management system. Additional tests were conducted by exposing components to environmental and proof of performance testing that validated the kit's ability to operate in the harsh environment of Northern Virginia while providing reliable messages to the motoring public.

Sign structures were inspected by VDoT with remediation made prior to the re-installation process.

Existing electrical and communication cabling was removed and replaced with new cabling, connections and power service using the existing raceway.

Because of the off-site techniques that were used for refurbishment, safety was increased and the impact to travellers minimised.
After testing and evaluation of the prototype kit as installed in the refurbished VMS sign case, the contractor refurbished 15 additional signs in the same manner from units VDoT nominated as candidates for retrofitting. These were representative of different vendors' products and sign configurations supplied over the years.

VDoT's approach to retrofitting its old VMS has been an unqualified success: additional retrofits are under contract and by year's end 2011, VDoT is expecting nearly 100 existing signs to have been refurbished.

Cost analysis

From the prototyping to the current projects that are deploying retrofitted VMS in Virginia, it was expected that there would be considerable cost saving in time and expense. Based on the estimated $300,000 per site cost for new signs, installed on new structures, the retrofitted cost is approximately $100,000. The prototyping process took approximately one year. The cost to the DoT for engineering was essentially zero as the work necessary to revise electrical power services and other field elements incidental to the retrofit were included in the contractor's price for retrofitting the signs.

The new signs used the latest technology that provides improved visibility and approximately 50% reduction in power consumption.

Additional savings are realised by minimising the maintenance required to support these 'like new' VMS.

Based on the success of the programme it is expected that many more VMS signs will be retrofitted within the next few years with cost savings of around $200,000 per sign compared to traditional replacement. In addition, this programme is expected to save the DoT approximately $300,000 per year in electricity and maintenance costs.

For more information on companies in this article

Related Content

  • New Hampshire plans for tomorrow’s communication
    August 21, 2017
    Someone once likened predicting the future to ‘nailing a jelly to the wall’. With ITS, C-ITS and V2X technology progressing at such a pace, predicting the future is more akin to trying to nail three jellies to the wall – but only having one nail. And yet with roadways having a lifetime measured in decades, that is exactly what highway engineers and traffic planners are expected to do. Fortunately, New Hampshire DoT (NHDoT) believes its technological advances may be able to provide a solution. The Central Ne
  • Radar effective as detection tool for hard shoulder running
    July 23, 2012
    Navtech Radar's millimetric-wave systems are being researched on the M42 in England to look into how this type of detector can assist in the opening of the hard shoulder as an additional running lane. Here, the company's Stephen Clark talks about the technology being used. In England, the Highways Agency's (the HA, an executive agency of the Department for Transport) Managed Motorways system - formerly called Active Traffic Management - uses electronic signs and signals mounted on gantries to direct drivers
  • Enforcement cuts distracted driving dramatically
    April 17, 2012
    The government of Indonesia says it is working to reduce the number of road deaths in the country by 50 per cent by 2020 and by 80 per cent by 2035. To achieve this, the government will be upgrading the road infrastructure as well as introducing a road safety programme that will run over a ten-year and 25-year plans, starting this year. The programme will be overseen by the National Planning Development Board with involvement of the national police as well as the public works, transportation, national educa
  • Connected Vehicles test vehicle to vehicle applications
    January 19, 2012
    In the US, the ITS Joint Program Office is about to conduct a series of Driver Clinics intended to gauge public reaction to Connected Vehicle safety technologies and applications. Starting in August, the US Department of Transportation (USDOT) will test Vehicle-to-Vehicle (V2V) applications with everyday drivers in what it describes as 'normal operational scenarios'. These Driver Clinics are being carried out at six locations across the US and together with the subsequent model deployment beginning in 2012,