Skip to main content

Work begins on Johannesburg’s Great Walk Bridge

Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg. ‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily. Construction, which is being implemented by the Johannesburg Development Agency (JDA) on
March 9, 2015 Read time: 2 mins
Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg.

‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily.

Construction, which is being implemented by the Johannesburg Development Agency (7362 JDA) on behalf of the City of Johannesburg, is due to be completed by October 2016.

"This project was initiated after a transport study indicated that as many as 10,000 pedestrians walk to and from Alexandra to employment in Sandton each day," JDA chief executive officer Thanduxolo Mendrew said at the sod-turning ceremony.

The bridge was designed by Royal Haskoning and is being built by Murray AND Roberts, with safety a top priority. It will incorporate three-metre wide pedestrian and cycling pathways separated by barriers from vehicles once it reaches the road. Concrete bollards will be placed on curves to prevent vehicle access.

For more information on companies in this article

Related Content

  • Australian highway upgrade gets under way
    October 31, 2013
    Work has begun on a US$130.8 million major upgrade to the Bruce Highway to increase the route’s capacity in north Queensland. The upgrade will increase seven kilometres of highway from two lanes to four lanes, with major works to be carried out on the intersections at Hunter Street, Abbott Street, Lakeside Drive and Stuart Drive. Federal MP George Christensen says a four lane overpass of the rail line at Cluden will be built to separate traffic from the existing open level crossing to improve safety on
  • IBTTA 2010 meeting focuses on sustainability
    February 2, 2012
    Ken Philmus, chief meeting organiser, talks about what attendees can expect to see at this year's IBTTA annual meeting and exhibition
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)