Skip to main content

Work begins on Johannesburg’s Great Walk Bridge

Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg. ‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily. Construction, which is being implemented by the Johannesburg Development Agency (JDA) on
March 9, 2015 Read time: 2 mins
Construction has begun on a US$10.7 million pedestrian and cycling bridge over one of Africa's busiest highways in Johannesburg.

‘The Great Walk Bridge’ will form part of a dedicated five kilometre pedestrian and cycling path from the heart of Alexandra to the centre of the Sandton central business district - providing a quicker, safer route for the estimated 10,000 people who walk or cycle between the two areas daily.

Construction, which is being implemented by the Johannesburg Development Agency (7362 JDA) on behalf of the City of Johannesburg, is due to be completed by October 2016.

"This project was initiated after a transport study indicated that as many as 10,000 pedestrians walk to and from Alexandra to employment in Sandton each day," JDA chief executive officer Thanduxolo Mendrew said at the sod-turning ceremony.

The bridge was designed by Royal Haskoning and is being built by Murray AND Roberts, with safety a top priority. It will incorporate three-metre wide pedestrian and cycling pathways separated by barriers from vehicles once it reaches the road. Concrete bollards will be placed on curves to prevent vehicle access.

For more information on companies in this article

Related Content

  • Port authority to replace ITS system at George Washington bridge
    November 16, 2012
    The Intelligent Transportation System (ITS) at the George Washington Bridge (GWB), first installed in 1997, is to be replaced by the Port Authority of New York and New Jersey as part of a road improvements being planned throughout the region. The ITS provides information on traffic conditions, estimated travel times, and lane restrictions to motorists via electronic signs on roads leading to the GWB. An estimated 101 million vehicles crossed the world’s busiest crossing in both directions in 2011. Work on t
  • Asecap Days 2025: 'Vision Zero is not a number, it’s about a culture'
    May 29, 2025
    Saving lives and saving road infrastructure were two of the topics at the second and last day of the annual conference of Asecap, the European road tolling association, in Spanish capital Madrid
  • Economic crisis needs non-partisan perspectives to stimulate growth
    February 2, 2012
    Kary Witt, President of the IBTTA and Pat Jones, Executive Director and CEO, talk about the need to put aside partisan perspectives in order to deal with the current economic crisis
  • TfL allocates funds to improve London’s traffic
    December 19, 2012
    Transport for London (TfL) has allocated more than US$240 million transportation projects in London, aimed at improving traffic flow and making both walking and cycling safer. The funding has been allocated through the Local Implementation Plan (LIP), allowing the money to be spent on projects that support the Mayor's Transport Strategy. "This funding will benefit all of London and everyone living in, working in or visiting the capital," London Mayor Boris Johnson said. "A world class city deserves a world