Skip to main content

Vancouver explores new rapid transit crossing

A feasibility study in the Canadian city of Vancouver is to explore six routes for a potential new transit crossing across the Burrard Inlet to the North Shore. 
By Ben Spencer March 9, 2020 Read time: 2 mins
Vancouver's Lions Gate Bridge is one of the main current crossings (© ArchonCodex | Dreamstime.com)

Claire Trevena, minister of transportation and infrastructure for the government of British Columbia, says: “We know that people living and working on the North Shore are frustrated with traffic congestion that has been increasing for years.”

“By investing in this study, our government is helping to take a serious look at solutions that expand our public transportation network to better connect communities and to help people move around freely.”

One of the main current crossings is via the iconic Lions Gate Bridge (pictured above), which takes vehicles, bikes and pedestrians. 

The six new routes to be explored (see map below) are:

•    Downtown Vancouver to Lonsdale via Brockton Point (tunnel)
•    Downtown Vancouver to West Vancouver via Lonsdale (tunnel)
•    Downtown Vancouver to Lonsdale via Second Narrows (new bridge)
•    Burnaby to Lonsdale via Second Narrows (new bridge)
•    Burnaby to Lonsdale via Second Narrows (existing bridge)
•    Downtown Vancouver to Lonsdale via First Narrows (tunnel)

Connecting Lonsdale City Centre with Vancouver’s metropolitan area and the regional rapid transit network was put forward by the Integrated North Shore Transportation Planning Project (INSTPP) in 2018.

Bowinn Ma, member of the British Columbia Legislative Assembly for North Vancouver-Lonsdale, who leads INSTPP, says: “This technical feasibility study to find a rapid transit solution across the Burrard Inlet is an important step toward a third fixed-link crossing to the North Shore.”

The Ministry of Transportation and Infrastructure, the districts of North Vancouver and West Vancouver, and the cities of Vancouver and North Vancouver are funding the study while TransLink is leading the procurement process. 

The results of the study will be used to inform the development of Transport 2050, TransLink’s updated regional transportation strategy. 

Vancouver: the transit options

Related Content

  • Hayden AI’s Renee Autumn Ray: ‘It’s about problem solving’
    December 6, 2022
    Renee Autumn Ray is senior director of global strategy for Hayden AI. She has also admitted to impostor syndrome, has no time for people who scorn the public sector and offers one simple rule about social media. Adam Hill meets her to find out what that is, among other things
  • Transit must be accessible to all, says SkedGo
    April 24, 2020
    When it comes to accessibility we need to embrace a more open and collaborative approach to ensure MaaS realises its true potential, says SkedGo’s Sandra Witzel – after all, a billion people on the planet have a disability
  • Vancouver’s SkyTrain Evergreen extension now in service
    December 9, 2016
    Metro Vancouver's regional transportation authority, TransLink, has inaugurated the SkyTrain Evergreen extension to the Millennium line, a significant expansion of the city’s integrated transportation network, connecting the Tri-cities to the existing SkyTrain system, regional bus network and West Coast Express. The SkyTrain line was first inaugurated in December 1985, utilising Thales’ communication-based train control system, SelTrac. Today, SelTrac rail signalling equips 100 per cent of the SkyTrain
  • Amey: Mobility must focus on collaboration
    November 26, 2019
    Traditional modes of transport are being disrupted by new technologies and private sector businesses. Amey says that sustainability and the need to forge partnerships will be key going forward.