Skip to main content

UK government’s US$283 million road building boost for Bedfordshire

Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1
March 4, 2016 Read time: 2 mins
Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017.

The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by 8101 Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council.

The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1, north of Dunstable and help reduce congestion through Dunstable town centre, offering motorists better journey time reliability and safer journeys. It includes the building of a completely new dualled road, three new junctions including a new motorway junction, and six new bridges.

The Woodside Link project will connect the industrial areas of Houghton Regis and Dunstable to a new M1 junction 11a. It is already attracting new businesses to the area. When open the 1.8 mile road will also reduce congestion on local roads and improve air quality.

Delivering the schemes will unlock up to 40 hectares of land for businesses and provide the infrastructure for 7,000 homes to be built to the north of Houghton Regis. They will also provide better access to the M1 and reduce congestion in Dunstable.

For more information on companies in this article

Related Content

  • Temporary traffic monitoring with Bluetooth and wi-fi
    May 31, 2013
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • UK government commits extra funding to boost electric van and truck use
    October 24, 2016
    The UK government is committing an additional US$4.8 million (£4 million) to the Plug-In Van grant scheme, extending the eligibility to larger electric vehicles so that all vans and trucks meeting the necessary requirements are eligible as part of the drive to reduce carbon emissions from transport use. Businesses will now benefit from grants up to US$24,000 (£20,000) when switching their large trucks to electric vehicles, Business and Energy secretary Greg Clark announced during a 3 day visit to Japan w
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Funding agreed for reconstruction of Fort Worth I-35W
    September 20, 2013
    A significant milestone in the redevelopment and expansion of Interstate 35W in Fort Worth, one of the most critical and most-congested corridors in the North Texas region and in the country has been achieved by NTE Mobility Partners Segments 3 LLC (NTEMP3). They have reached financial agreement on Segment 3A of the North Tarrant Express (NTE), paving the way for the reconstruction and expansion of the interstate. The project is being financed through a unique combination of public and private funds: US$