Skip to main content

Scotland introduces first ITS system

A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90. The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable. The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway
December 5, 2012 Read time: 2 mins
A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90.

The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable.

The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway, which will automatically detect the build-up of congestion and vary the mandatory speed limit to help keep drivers moving.

Traffic Scotland says this is the first time such a system has been used in Scotland, although similar managed motorway schemes have been successfully implemented in England on sections of the M25 and M42.

The system will be extended to the M9 and M9 spur in 2013, and the final phase will be introduced in 2016 when the new Forth crossing is complete, when the system will extend over a length of 22km.  This will also include a new operating regime for both the Forth Road Bridge and the new Crossing, catering for situations when high winds affect the Forth Road Bridge.

Transport Minister Keith Brown said: "The Forth Replacement Crossing is a flagship project for the 2112 Scottish Government's determination to invest in our national infrastructure and, in turn, protect and grow our economy. And it is already delivering.

"The project, which is on time and on budget, was always about more than just the building of a new bridge, as impressive a feat of civil engineering as that stunning structure will ultimately prove to be.

"It was about improving that vital cross-Forth link and using existing infrastructure more efficiently to ensure better traffic flow and more reliable journey times, prioritised public transport, improved safety and lower emissions."

Related Content

  • March 19, 2014
    Highways Agency plans to increase capacity of M4
    The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
  • April 14, 2015
    IAM calls for greater education for smart motorway users
    As smart motorways reach their first birthday in the UK this week, the Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion still exists amongst motorway users on how best to use them. Smart motorways were officially introduced this time last year to replace Managed Motorways as the solution to the nation’s congested motorways but concerns have been raised over their safety. England’s first all-lane running motorway, i.e. without a hard shoulder, opened on the 2.5 km
  • February 12, 2013
    M62 managed motorway scheme signs switched on
    Work to upgrade part of the M62 in West Yorkshire to a managed motorway, the first scheme in the Yorkshire and Humber region, reached a significant milestone when the first overhead electronic signs went live. For the first time, the variable advisory speed limit signs have come into operation between junctions 27 and 28 to allow the UK Highways Agency to calibrate and test the technology required for the new managed motorway, with the signs being switched on and off in response to traffic conditions. Advis
  • December 20, 2017
    Mott MacDonald designed M2M metering scheme begins testing
    Mott MacDonald (MM) has designed a Highways England scheme to smooth traffic flows, reduce queues and to combat eastbound congestion on the M62's junction 10 and 11 as well as traffic joining the motorway from the M6 northbound and southbound link roads. The project will operate during 2018 and be monitored to evaluate the benefits. Called The Motorway to Motorway (M2M) metering pilot scheme, it combines variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62