Skip to main content

Scotland introduces first ITS system

A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90. The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable. The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway
December 5, 2012 Read time: 2 mins
A new intelligent transport system (ITS) has been launched as part of the Forth Replacement Crossing in Fife, Scotland, to ease congestion on the M90.

The motorway management system will create a dedicated bus lane as well as carriageway variable speed limits which will be used during periods of congestion to help smooth traffic flow, reduce congestion and help make journey times more reliable.

The system features seventeen new motorway overhead gantries linked to traffic sensors embedded in the carriageway, which will automatically detect the build-up of congestion and vary the mandatory speed limit to help keep drivers moving.

Traffic Scotland says this is the first time such a system has been used in Scotland, although similar managed motorway schemes have been successfully implemented in England on sections of the M25 and M42.

The system will be extended to the M9 and M9 spur in 2013, and the final phase will be introduced in 2016 when the new Forth crossing is complete, when the system will extend over a length of 22km.  This will also include a new operating regime for both the Forth Road Bridge and the new Crossing, catering for situations when high winds affect the Forth Road Bridge.

Transport Minister Keith Brown said: "The Forth Replacement Crossing is a flagship project for the 2112 Scottish Government's determination to invest in our national infrastructure and, in turn, protect and grow our economy. And it is already delivering.

"The project, which is on time and on budget, was always about more than just the building of a new bridge, as impressive a feat of civil engineering as that stunning structure will ultimately prove to be.

"It was about improving that vital cross-Forth link and using existing infrastructure more efficiently to ensure better traffic flow and more reliable journey times, prioritised public transport, improved safety and lower emissions."

Related Content

  • February 2, 2016
    Smarter motorway for West Yorkshire
    Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
  • February 2, 2012
    Variable message signs continue to deliver travel information
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution
  • October 22, 2014
    HGV speed limit pilot given the seal of approval
    The legislation to allow heavy goods vehicles (HGVs) to travel at 50mph on sections of single carriageway on the A9 between Perth and Inverness in Scotland has been signed and will come into force at the same time as the average speed camera system on the route becomes operational – 28 October. The pilot, which was approved by the Scottish Parliament earlier this year, will help to improve journey times and also driver behaviour, by reducing frustration, queue lengths and journey times for HGVs. Trans
  • November 8, 2013
    'Smart' motorways on their way to Greater Manchester
    Details of a multi-million pound project have been unveiled that will cut congestion and improve journey times on parts of the M60 and M62 in Greater Manchester. The smart motorways scheme – the first of its kind in the north-west – will be introduced on a 17-mile stretch of the network between junction 8 of the M60 near Sale and junction 20 of the M62 near Rochdale. The system will use the latest technology to monitor traffic levels, provide traffic information to road users, and ease congestion by usin