Skip to main content

Sadiq Khan proposes Cycle Superhighway 9, West London

London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford. The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer. The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light
September 26, 2017 Read time: 1 min
London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford.


The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer.

The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light crossings and over 20 upgraded pedestrian crossings.

Following the results of the consultation, 1466 Transport for London and partner boroughs aim to begin construction late next year.

UTC

Related Content

  • September 15, 2015
    EIB backing for London transport
    The European Investment Bank (EIB) has agreed to provide US$1.5 billion for investment in the London transport network. The 35 year loan from Europe’s long-term lending institution will support major projects, including significant upgrades by Transport for London (TfL) at Victoria and Bank Tube stations, which will transform passenger access at two of the busiest stations in the capital. The new support was announced by Jonathan Taylor, vice president of the European Investment Bank and Steve Allen, ma
  • September 3, 2012
    Eco Multi monitors London walking and cycling routes
    Traffic Technology Ltd. has revealed its involvement over the last three years with Transport for London (TfL) in developing and deploying monitoring systems for the London Olympics 2012 games walking and cycling routes. The company supplied its Eco Multi pedestrian and cycle monitoring systems which have been installed in four locations on the eight designated ‘2012 Games Walking & Cycling Routes’. Traffic Technology says the unique ‘click and lock’ modular system of the Eco Multi enables several units to
  • March 22, 2022
    Cities get road priorities right
    Cities including Paris, Milan and London have all announced serious expansions to their bicycling infrastructure over the last few years. The era of active travel is here, finds Alan Dron
  • April 7, 2017
    Highways England announces funding to improve major motorway junction
    Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect. Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years. New traffic light