Skip to main content

Sadiq Khan proposes Cycle Superhighway 9, West London

London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford. The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer. The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light
September 26, 2017 Read time: 1 min
London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford.


The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer.

The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light crossings and over 20 upgraded pedestrian crossings.

Following the results of the consultation, 1466 Transport for London and partner boroughs aim to begin construction late next year.

UTC

Related Content

  • April 11, 2017
    JV wins multi-billion dollar West Gate Tunnel project
    CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
  • January 26, 2016
    London invests in bus priority schemes to help keep bus passengers moving
    With London’s roads seeing an increase in congestion due to a construction boom and a significant growth in population, Transport for London is investing heavily in helping keep the roads moving through a range of means. Part of this programme is designed to help buses get through congested areas quicker and more reliably. A US$284 million investment in new bus priority schemes in the capital includes changes to road layouts and junctions and enabling small changes to routes so that buses can avoid traff
  • September 22, 2014
    TfL opts for RedSpeed safety cameras
    RedSpeed International is to supply around 600 speed and red light safety cameras to Transport for London (TfL). The award is the result of a process which started in August 2012 and will see the company’s SpeedCurb and RedSpeed products progressively installed with a completion date of October 2016. The installation of the RedSpeed digital red light camera replacement in London has already started. The cameras not only enforce against red light running, but also monitor and enforce against vehicles brea
  • January 6, 2017
    Multi counters determine popularity of pedestrian and cycle routes
    Belfast City Council has installed three pedestrian and cycle counters from UK company Traffic Technology to monitor and record the numbers of people walking or cycling in two areas of the city. The counters are installed on urban posts, two in the new CS Lewis Square, named after one of Northern Ireland’s most famous writers. The other is at the Sam Thompson Bridge which connects Victoria Park to Airport Road, the Harbour Estate and Titanic Quarter and opens up access to the 9km Connswater Community Gre