Skip to main content

Northern Futures: improvements for northern road and rail

As the Northern Futures Summit begins, UK Deputy Prime Minister Nick Clegg announces better trains in the north to reduce overcrowding and cut journey times. More than 25 million people use cross-Pennine rail routes every year, and over a third of passengers have to stand during their commute. By 2025 the Deputy Prime Minister wants to see electrified cross-Pennine links between Liverpool and Manchester on one side and Leeds, Sheffield, Newcastle and Hull on the other. This will shorten journey times
November 6, 2014 Read time: 2 mins
As the Northern Futures Summit begins, UK Deputy Prime Minister Nick Clegg announces better trains in the north to reduce overcrowding and cut journey times.

More than 25 million people use cross-Pennine rail routes every year, and over a third of passengers have to stand during their commute.

By 2025 the Deputy Prime Minister wants to see electrified cross-Pennine links between Liverpool and Manchester on one side and Leeds, Sheffield, Newcastle and Hull on the other. This will shorten journey times to 40 minutes at most between any two of Manchester, Leeds and Sheffield and end the misery of overcrowding when people journey to work.

Clegg said: “One of the key things that comes up time and again is the need for better transport links – electrification for the rail networks connecting Leeds, Sheffield and Manchester, renovation of the dilapidated commuter lines. That is why I am pushing for a huge programme of transport improvements in the North to begin immediately.

The North needs improved transport now. The roads and railway lines connecting our great northern cities have seen improvements in recent years, but I want more, much more.

He also stressed the need to improve road links in the region, saying, “This is not just about rail. 64 per cent of journeys in the North are by car.

“We need to build on the announcements already made to improve road links such as the M62. I want to go further, starting by extending the full stretch of the M62 between Manchester and Leeds to eight lanes using the ‘smart’ motorway model (that is, turning the hard shoulder into a fourth lane in each direction) and having a programme of improvements for the Woodhead Pass (A618/A626) between Manchester and Sheffield. I will push to see these in the upcoming Roads Investment Strategy for completion by 2025.”

Related Content

  • Australia highway to receive smart tech 
    October 12, 2021
    Smart motorway tech will be installed between Pine River and Caloundra Road
  • Infrastructure spending is an investment in economic recovery
    January 20, 2012
    Transportation funding is caught in the crossfire as the President calls for infrastructure investment and a reinvigorated Republican majority in the House pushes back on federal spending. Andrew Bardin Williams reports. Every few months some politician or pundit declares that the country is on the verge of making the most important political decision in a generation. The 2006 mid-term election; the 2008 Presidential election; the passing of the stimulus bill; healthcare reform; the mania surrounding Tea Pa
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Strabag awarded rail contract in Hungary
    September 19, 2016
    Strabag is to electrify and upgrade the 51 km railway line between Budapest and Esztergom under a contract awarded by Hungarian investment company, NIF (National Infrastructure Development). The contract, valued at around US$120.5 million (€108 million), will be carried out as a joint venture with TRSZ and MVM OVIT. Construction will begin this summer and is scheduled for completion in 2018. The contract includes new stairs, wide platforms, pedestrian underpass and barrier-free access and noise barriers