Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • NCDOT chooses PPP to improve I-77 traffic flow in Charlotte
    April 17, 2014
    North Carolina Department of Transportation’s (NCDOT) has announced the apparent successful bidder for its first public-private-partnership (P3) contract to improve the traffic flow along 26 miles of I-77 in the Charlotte area, one of the most congested roadways in the state. It includes the development of HOT lanes in both directions. Following a required bidding process and pending final review Cintra Infraestructures will construct the I-77 project through a joint venture with F.A. Southeast, W.C. En
  • Mott Macdonald JV completes Sydney Metro Northwest
    June 11, 2019
    Mott Macdonald and its joint venture partners have completed the Sydney Metro Northwest, an autonomous train service available for commuters in the Australian city. Delivering 36km of new metro rail, the AUS$8.3 billion (£4.5bn) project is expected to improve travel times and increase the reliability of trains. It also comprises eight new stations from the Epping suburb to Tallawong railway station, five upgraded stations and 4,000 commuter car parking spaces. Mott Macdonald worked with engineering compan
  • Thales to upgrade Greater Cairo Metro
    December 18, 2015
    More than 30 years after winning its first contract for the Greater Cairo Metro, Thales has signed two contracts with the metro operator; the first is for an upgrade of the fare collection system for Lines 1 and 2 of the Egyptian capital’s rapid transit network and the second for a full integrated communications and supervision system for the Al Thawra extension on the line 3 (Phase 3). Thales will deploy its TransCity fare collection solution on Lines 1 and 2 of the Cairo Metro, replacing the equipment
  • Salvador metro engineering contract awarded to Egis
    January 9, 2014
    French engineering and construction firm Egis has been awarded a US$16 million engineering contract by Brazil’s build and operate concessionaire CCR (Companhia de Concessões Rodoviárias) for the construction of the Salvador metro in the state capital of Bahia, Brazil. The project comprises the completion of the seven kilometre line 1, which is partly underground, the construction of five kilometres of extensions to this first line and the construction of the 24 kilometre line 2, serving Salvador’s inter