Skip to main content

Louis Berger awarded Mumbai Metro Line four contract

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
April 12, 2018 Read time: 2 mins

The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded 4736 Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%.

Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central railway and Mumbai’s Monorail as well as providing links to proposed metro lines 2B, 5, 6 and 8.

The consortium also comprises DB Engineering and Hill International. Louis Berger will prepare, package and finalise tender documents for system contracts. The project’s scope also includes verification and approval of all civil and system contract design submissions, rolling stock, supervision of all construction activities, certification of vendor sources and inspection of vendor products and services.

Kshitish Nadgauda, Louis Berger’s senior vice president and managing director for Asia, said: “This metro line is a welcome addition for the people of Mumbai. It will help alleviate traffic congestion and provide better connectivity between central Mumbai and the Thane district.”

For more information on companies in this article

Related Content

  • Cubic awarded London ticketing contract
    July 30, 2014
    Transport for London (TfL) has confirmed the award of its Electra ticketing and fare collection contract, starting in August 2015, to Cubic Corporation’s UK subsidiary Cubic Transportation Systems following a competitive tender. The seven-year contract is valued at over US$700 million and includes an option to extend the contract for a further three years, giving the contract an expected value of over US$1 billion. The announcement means the continuation of the partnership between TfL and Cubic which ha
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is
  • Thales upgrading Kuala Lumpur monorail signalling
    March 23, 2012
    Scomi Engineering, which is upgrading Kuala Lumpur monorail for its operator Prasarana, has selected Thales to supply a turnkey signalling solution costing some US$18.6 million. The monorail, operational since 2003 in Malaysia’s capital, is currently expanding its passenger transportation capacity by the introduction of new rolling stock with four-carriage trains and by the replacement of the existing signalling along the eleven stations of the monorail.
  • American Center for Mobility gets top ITSA award
    June 6, 2018
    The non-profit public-private partnership American Center for Mobility and the US-23 Flex Route project carried off the two top honours in the ITS America awards. “It’s an honour to get a top award from ITS America,” said Paul Algebra, university region engineer with the Michigan Department of Transportation (left) which is working with HNTB on the US-23 Flex Route. The project is Michigan’s first Active Traffic Management system that provides additional capacity during peak use hours. US-23 won in the tra