Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

Related Content

  • February 28, 2017
    London ‘needs next generation of infrastructure to compete’
    Improving the capital’s infrastructure, through Crossrail 2, a new runway at Heathrow and East London river crossings, is key to the city’s future success and ability to compete, according to the latest CBI/CBRE London Business Survey. More than eight in ten of London’s companies see Crossrail 2 as being central to the capital’s successful expansion. Meanwhile, a similar number of firms think sticking to the Government’s current timetables for building Heathrow’s third runway is vital to London’s attractive
  • January 3, 2018
    Zipcar deploys car sharing service across eight London Boroughs
    Floating car service Zipcar Flex (Zipcar), which is said to save 54% of transport costs compared to ride-hailing companies, has been made available to 3.5m Londoners across several Boroughs. The 29p per mile solution is designed to provide its members an environmentally friendly alternative to private car ownership and will only charge for the exact time of their trip. Members can use the car for a one-way journey and be dropped off in one of the thousands of spaces available within its Zipzone, which
  • August 5, 2020
    White lines? Cyclists need more
    Just painting lines on the road isn’t sufficient to persuade most people to cycle – you need to separate them from motor vehicles altogether. David Arminas talks to transportation engineer Tyler Golly about the Covid ‘wake-up call’
  • March 7, 2017
    Plans submitted for UK’s Luton Airport Gateway
    Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f