Skip to main content

Plans submitted for UK’s Luton Airport Gateway

Knight Architects and Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station. The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a f
March 7, 2017 Read time: 2 mins
Knight Architects and 7942 Arup have submitted plans for Luton Airport Gateway; a new bridge which will form part of the US$244 million (£200 million) mass passenger transit (MPT) system linking London Luton Airport with Luton Parkway railway station.

The MPT will enable fast, easy access from central London to the UK’s fifth biggest and fastest-growing major airport in 30 minutes by providing a seamless transfer time of just five minutes from Luton Airport Parkway to the airport terminal. The system will be a fully-automated, two-way, 24-hour capable people-mover based on latest system technology and design innovation running alongside the mainline railway before crossing over Airport Way via the new landmark bridge.

The London Luton Gateway Bridge has been designed as an asymmetric truss structure, spanning 72m across the busy Airport Way. Its top chord traces a parabola which springs tangentially from the deck, before tapering to a slender profile which appears to fade into the distance.

At night the top chord is illuminated with an active-led system. attached directly to the structure and aimed downwards. This allows the lighting system safely operate in its airport environment, without interfering with the functional lighting behind.

Subject to planning permission, work could begin in late 2017, with the system ready for operation by spring 2021.

Related Content

  • September 25, 2013
    Luton to Dunstable guided busway opens
    Following many years of planning, the Luton and Dunstable guided busway is now open to the public. The US$146 million project will provide a reliable and efficient 15 minute public transport link between the two main town centres. Overall, the route involves over 10 kilometres of segregated bus-only road from Luton Airport through Dunstable to Houghton Regis in Bedfordshire.
  • April 5, 2017
    Autonomous vehicle takes to the road in UK
    An autonomous shuttle is to take to the road as part of the UK GATEway Project (Greenwich Automated Transport Environment) research into public acceptance of, and attitudes towards, driverless vehicles. In the latest phase of the GATEway Project a prototype shuttle will begin driverless navigation of a 2km route around the Greenwich Peninsula, using advanced sensors and state-of-the-art autonomy software to detect and avoid obstacles whilst carrying members of the public participating in the research stu
  • December 9, 2013
    UK plans fully integrated transport network to high tech hot spots
    The UK government’s plans to support the country’s burgeoning high-tech industry, centred on London, Cambridge and Oxford, are being facilitated by the Department for Transport (DfT) and its plans for a fully integrated transport network linking each of the three core technical clusters, as well as the wider technical community. The DfT is developing proposals for the construction of a new railway line from Bedford to Cambridge. This would build on the ongoing work on the east-west rail project and compl
  • January 29, 2016
    Heathrow’s Ultra Pod technology joins GATEway driverless car pilot
    British companies Westfield Sportscars, Heathrow Enterprises and Oxbotica have joined the GATEway (Greenwich Automated Transport Environment) project in Greenwich and are currently developing driverless shuttles for operation in Greenwich in summer 2016. Using entirely British engineering and software capabilities, the new consortium members will be developing the existing UltraPods currently in service at Heathrow Airport into fully autonomous and electric passenger shuttles. Operating at Terminal 5 for ne