Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

UTC

Related Content

  • December 21, 2015
    London’s Santander cycles to be fitted with cyclist safety lights
    After a successful trial, the Mayor of London, Boris Johnson MP, Transport for London (TfL), and Santander UK have announced that all 11,500 Santander Cycles will be fitted with Blaze Laserlights over time from early 2016. The project is largely funded by Santander UK as part of the partnership with TfL. The Blaze Laserlight projects the symbol of a bicycle shape six metres in front of the cycle, onto the ground, giving the cyclist a larger footprint on the road. This makes their presence known, alerts driv
  • July 18, 2014
    Contracts awarded for London’s traffic signals upgrade
    Transport for London (TfL) has awarded new traffic signals maintenance contracts, worth around US$542 million for up to eight years, which will see the capital’s 6,000 traffic signals upgraded and maintained to the latest, greenest standards. Awarded to Telent Technology Services for west and south-west London, Siemens for north and north-west London and Cubic Transportation Systems for south-east London, the new Traffic Control Management Services contracts will help expand the use of intelligent traf
  • October 21, 2014
    London’s strategy to tackle air quality problems
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • July 6, 2018
    TfL’s Santander Cycles break hire records
    Transport for London (TfL) says its Santander Cycles were used by record-breaking numbers of people in June (1.2million) and May (1.1m). The capital's heatwave has encouraged more people to explore the city on bicycles, the local government body adds. Santander Cycles met the demand by providing additional bikes at parks and launching a new trial in Westminster and the City which offered more of its models during peak commute times.