Skip to main content

London’s new Cycle Superhighway given the green light

The Mayor of London, Sadiq Khan, and Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.
September 1, 2016 Read time: 2 mins

The Mayor of London, Sadiq Khan, and 1466 Transport for London (TfL) are to proceed with the North-South Cycle Superhighway to King’s Cross after majority support in the recent public consultation. The plans, which will also benefit pedestrians with wider pavements and more crossing points, were supported by 70 per cent of the public.

Once complete the full North-South route, also known as Cycle Superhighway 6 (CS6), will provide a safe and direct route for cyclists across central London between Elephant and Castle and King’s Cross. 5km in total, the route will be either fully separated from traffic, or on quiet back streets. At its northern end, the route will connect both with the planned Quietway 2, and Central London Grid routes, allowing cyclists to travel safely to Hackney, Walthamstow, Camden and Swiss Cottage and opening up the city to cycling.

TfL has closely considered all of the responses received in the consultation for this scheme and incorporated several changes to the original plan to address the concerns of local residents and stakeholders. A detailed design will now be developed and, subject to approval from Camden Council and Islington Council, construction will begin in spring 2017.

Pedestrians will also benefit from the plans with 1,600sq metres of new footway along the route as well as 14 new or upgraded signalised pedestrian crossings with tactile paving and pedestrian countdown technology. It will also provide a much improved pedestrian crossing at Farringdon Road for the many thousands of Thameslink passengers who use Farringdon station each day and for those who will use the new Crossrail station in two years’ time.

For more information on companies in this article

Related Content

  • GPS accuracy concern in US
    April 17, 2012
    Pressure is growing in the US over concerns that GPS accuracy could be affected. A coalition has formed that comprises an array of the leading construction equipment manufacturers, GPS technology providers and other concerned bodies including those from the agricultural and airline industries. The coalition claims that up to 3.3 million US jobs could be affected by the threat to GPS accuracy, with an economic impact of some US$96 billion in annual direct economic benefits to the US economy.
  • Joined-up thinking for future ITS
    May 8, 2015
    David Crawford looks at a US model which, for modest federal funding, is producing substantive results. Outward and upward is the clear message emerging from the US$458,000, 2015 workplan of the US government’s ENTERPRISE (Evaluating New TEchnologies for Roads PRogram Initiatives in Safety and Efficiency) joint funding scheme for ITS research.
  • Olympic challenges in Sochi
    May 27, 2014
    Sporting events always create problems for traffic planners and none more so than the Winter Olympics. It is difficult to think of more diametrically opposite challenges for transport planners than the 2012 Olympics in London and this year’s Winter Olympics in Sochi: from a summer event in the heart of a megacity with well established transport infrastructure to winter games with unpredictable weather and events in remote and mountainous locations. The Winter Games are always a challenge and Sochi was no di
  • UK ‘pauses’ smart motorway roll-out
    January 12, 2022
    All-lane running motorway schemes to be halted until five years' safety data is available