Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

Related Content

  • Glasgow installs Q-Free cycling safety system
    August 26, 2021
    Scottish city to use new HI-TRAC CMU detection solution and in-road sensors to boost bike safety
  • Measures announced to improve cycle safety in London
    September 5, 2013
    A series of recently-announced measures to improve cycle safety in London include the establishment of a new industrial heavy goods vehicle (HGV) task force to take direct action against dangerous HGV drivers, vehicles and operators, review exemptions to current HGV regulations and a call for European Union to speed up its review on the design of HGVs to increase drivers’ visibility of vulnerable road users. In addition, the Department for Transport (DfT) and the Driving Standards Agency are to issue a c
  • Temporary traffic monitoring with Bluetooth and wi-fi
    May 31, 2013
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech
  • Encouraging cycling: small outlay and big returns
    May 8, 2015
    Pete Zanzottera explains why considering cycling in urban planning is a win-win situation. The Cycling Delivery Plan published by the UKs Department for Transport (UKDfT) contains 13 mentions of ‘cycle proofing’ a term that has been growing in use, but what does it mean, and have we got the wrong word? Should we instead be proving that we can create infrastructure that invites cyclists into the transport network?