Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

Related Content

  • Frequency changes threaten vehicle safety applications
    January 24, 2012
    The use of frequency spectrum at 5.9GHz for vehicle safety applications is at risk because of two draft bills currently before Congress. Here, we look at why and what’s being done to address the issue. In the US, the right of cooperative infrastructure to use frequency at 5.9GHz is under threat as a result of the proposal of two bills in Congress. The chronology of spectrum allocation for Dedicated Short- Range Communications (DSRC)-based Vehicle-to-Infrastructure (V2I) and Vehicle-to-Vehicle (V2V) safety a
  • Aimsun makes Paris match
    March 11, 2021
    How do digital twins allow city planners to test out new road layouts virtually?
  • Anywhere card delivers prepaid contactless ticketing
    January 25, 2012
    David Crawford investigates a far reaching initiative in integrated travel. The Port Authority Transit Corporation (PATCO), an operator of high speed commuter rail in the north eastern US, is not one of the world's best known transit providers. Its 13 stations along a single east-west route (three of them interchanges with other regional commuter lines) handle 40,000 passengers a day, travelling to and from Philadelphia, the US' fifth most populous city.
  • Bombardier to build new London Overground trains
    July 2, 2015
    Transport for London (TfL) has awarded Bombardier a contract to build a new fleet of trains which will see 45 new trains come into service from 2018. The new trains will operate on the Liverpool Street to Enfield Town, Cheshunt (via Seven Sisters) and Chingford routes and the routes between Barking and Gospel Oak and between Romford and Upminster. It will also enable London Overground to improve service frequencies on other routes. The trains will have similar features to the fleet that serves other