Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.

Related Content

  • A new era for England’s major roads
    March 26, 2015
    Highways England, the government-owned company which will deliver the largest investment in England’s major roads in a generation, officially launches next week. The company, which replaces the Highways Agency from 1 April, will invest US$16 billion in delivering a raft of improvements on England’s motorways and major A roads making roads even safer, improving traffic flow and reducing congestion. The improvements over the first five years of operation include: 112 major improvements, including 15 sma
  • Notts cyclists get £9.2m bridge
    December 28, 2020
    Amey picked for River Trent project to connect to the UK city’s 27-hectare Waterside site
  • Data holds the key to combating VRU casualties
    May 8, 2015
    Accident analysis software can help authorities identify common causes and make best use of their budgets, as Will Baron explains. More than 1.2 million people die on the world’s roads each year and according to the World Health Organisation, half of these are pedestrians and vulnerable road users (those whose vehicle does not have a protective shell, such as motorcyclists and cyclists). While much has been done to improve road safety and cut the number of deaths and serious injuries on our roads, a great d
  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to