Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.
UTC

Related Content

  • December 19, 2013
    First electric buses hit London’s streets
    Transport for London (TfL) and bus operator Go-Ahead London have begun a trial of the capital’s first electric buses on two routes in the city. The 12-metre single deck buses were built by Chinese manufacturer BYD Auto have zero tail pipe emissions, resulting in lower carbon emissions. The trial will help TfL develop plans for greater use of electric buses in central London in the future, supporting the Mayor’s vision of a central London Ultra Low Emission Zone. The trial will be used to establish wh
  • December 21, 2015
    London’s Santander cycles to be fitted with cyclist safety lights
    After a successful trial, the Mayor of London, Boris Johnson MP, Transport for London (TfL), and Santander UK have announced that all 11,500 Santander Cycles will be fitted with Blaze Laserlights over time from early 2016. The project is largely funded by Santander UK as part of the partnership with TfL. The Blaze Laserlight projects the symbol of a bicycle shape six metres in front of the cycle, onto the ground, giving the cyclist a larger footprint on the road. This makes their presence known, alerts driv
  • September 30, 2015
    Mayor unveils expanded traffic-busting plans to keep London moving
    The Mayor of London, Boris Johnson, has unveiled the new measures Transport for London (TfL) is introducing to ease traffic in the capital and minimise disruption on the roads as major work to improve the network continues as part of the Mayor’s US$6 billion Road Modernisation Plan. The innovations include: Trials of new technology - for the first time on the TfL road network a new generation of digital road signs will provide people with real-time information on journeys using major routes into London.
  • September 11, 2015
    London’s pedestrian countdown technology to be doubled by summer 2016
    The number of pedestrian countdown sites across London will be doubled by summer 2016, the Mayor and Transport for London (TfL) have confirmed. The technology forms a key part of London’s first Pedestrian Safety Action Plan and replaces the ‘blackout’ period on traffic signals with a numerical counter to show how long pedestrians have left to safely cross the road. The Mayor had set TfL a target of upgrading 400 crossings – 10 per cent of all those in London – with the technology by April 2016. This targ