Skip to main content

Local residents back major safety improvements at Hammersmith gyratory

Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support. Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers. Th
August 8, 2016 Read time: 2 mins
1466 Transport for London (TfL) has released the results of the Hammersmith gyratory improvement consultation, which received a high level of public support.

Nearly 80 per cent of respondents backed TfL’s plans for improvements, which will significantly improve cyclist safety at one of London's most intimidating and busy junctions. Dedicated cycling crossings will be installed, pedestrian facilities will be improved and a new bus lane added that will boost the reliability of bus services for customers.

The direct, kerb-segregated 750 metre two-way route for cyclists will remove the need to cycle around the gyratory, mixing with fast-moving traffic, and will break a key barrier to cycling in west London.

TfL intends to proceed with the changes, but will investigate retaining a pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road following consultation feedback. Construction is set to start next summer and is expected to be completed in summer 2018.

Other improvements include eight cyclist-specific signals at junctions to separate cyclists and motorised vehicles, pedestrian countdown signals at six crossings and a new eastbound cycle track to enable onward connections on the A315 corridor.

TfL is working with the London Borough of Hammersmith & Fulham to develop proposals for cycle improvements along the A315 corridor, which runs through Hammersmith gyratory.

These improvements would provide a continuous cycle route across the whole of the borough and are due for consultation next year. This route would form part of Cycle Superhighway 9 which is still in the early stages of design. It is subject to further work and discussion with stakeholders including the London Boroughs of Hammersmith & Fulham and Hounslow. The changes to the Hammersmith gyratory will be future-proofed to take into account this potential new cycle route and would allow for any long term further transformation of the gyratory.
UTC

Related Content

  • December 16, 2013
    Crossrail project receives US$814 million EIB funding
    The European Investment Bank (EIB), Europe’s long-term lending institution, has provided further funds to support the latest step in Crossrail’s development with a loan of up to US$814 million to Transport for London (TfL). The facility will be used for financing a fleet of new high-capacity air-conditioned trains as well as a new maintenance depot. Finance contracts were signed in London this week by Steve Allen, TfL’s Managing Director Finance and Jonathan Taylor, European Investment Bank Vice President.
  • July 31, 2017
    Grants available to encourage more Londoners to take up cycling
    Transport for London (TfL) is inviting community and not-for-profit groups across London to apply for grants to get their communities cycling. This year TfL is making available up to US$393,000 (£300,000) to help 30 groups offer a range of cycling initiatives aimed at people who may not otherwise ride a bike. Initiatives include cycle training, loan bikes, guided rides and courses to teach basic cycle maintenance. New projects will receive up to US$13,000 (£10,000) over three years. To encourage an even wid
  • October 31, 2016
    London borough partners TfL’s drive for safer roads
    The Royal Borough of Greenwich is partnering with Transport for London (TfL) to run a new consultation on changes to the West Parkside and Pilot Busway on Greenwich Peninsula. Residents are asked to help shape the final plan by submitting their views on the proposals. The proposals aim to create a dual carriageway with dedicated 24/7 bus lanes on either side of the central reservation and improve road safety. It also aims to keep journey times for bus passengers travelling to and from North Greenwich low
  • November 30, 2015
    London launches new team to crack down on congestion
    A new team of Road and Transport Enforcement Officers is being deployed to key traffic routes across London to crack down on illegal or inconsiderate behaviour and other problems that cause congestion. The new 40-strong Transport for London (TfL) team, which will rise to 80 by next spring, will help deal with problems such as illegal stopping or unloading of deliveries, which can cause delays to drivers and bus passengers. It will work closely with the TfL-funded Metropolitan Police Roads and Transpo