Skip to main content

Jakarta plans integrated tunnels for traffic and floodwater

Jakarta’s city administration is to begin work on building two dual-purpose tunnels by the end of the year in an effort to address increasingly dire conditions on the capital’s gridlocked, flood-prone streets.
April 28, 2014 Read time: 1 min
Jakarta’s city administration is to begin work on building two dual-purpose tunnels by the end of the year in an effort to address increasingly dire conditions on the capital’s gridlocked, flood-prone streets.

Private building contractor Antaredja Mulia Jaya has been awarded a contract for the Jakarta Integrated Tunnel (JIT) project, which will incorporate two tunnels is set to measured 11 metres in diameter and 12 kilometres in length, from five to 15 metres below ground.  The tunnels have been designed to carry flood water and traffic on separate levels, at a projected cost of US$2.92 billion.

“The JIT development will be in collaboration with French investor Bouygues,” Antaredja head Agus Sidharta said on Friday at City Hall. Agus said his company would work with Jakarta’s toll road developer to build and maintain the road portion of the project.

Related Content

  • Telensa lights up Hertfordshire
    November 27, 2014
    More than 12,600 street lights on Hertfordshire’s A-roads are being upgraded to LED lighting using Telensa’s PLANet street light central management system (CMS), which will allow the lights to be monitored from a central point. This will reduce inspection costs and make it easier to spot and repair any faults. The system will also allow lighting levels on the A-roads to be reduced during the night, rather than turning lights off completely. Once the new lights are installed, light levels will be reduced
  • Rwanda's mobility plan in seven junctions
    June 16, 2025
    ITS improvements at just seven intersections could be the key to improving transportation in Rwanda’s capital, Kigali: Shem Oirere reports from East Africa
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst