Skip to main content

Iteris awarded transit performance initiative project by San Francisco transit company

Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
May 31, 2017 Read time: 1 min
Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.


This contract continues 73 Iteris’ involvement on 274 AC Transit’s popular Line 97, which spans 12.5 miles along a number of major corridors in the San Francisco Bay Area.

The design phase of the project is under way with deployment anticipated in 2018. Transit signal priority helps to reduce delay and improve schedule reliability for transit operations. Currently the service time for this route is 134 minutes. Once the project improvements are fully deployed, a roundtrip travel time is expected to be reduced by as much as 15 per cent.

UTC

Related Content

  • July 26, 2012
    San Bernardino BRT project advancing
    McCain has announced the official release of its first round of traffic equipment for the Omnitrans E Street Corridor sbX Bus Rapid Transit (BRT) project in San Bernardino Valley, California. Project materials for release includes traffic signals, traffic signal controllers, traffic controller cabinets, poles, safety lighting, and battery backup systems.
  • July 3, 2014
    Orange County awards $1.4 million traffic signal synchronisation project
    Iteris has expanded its relationship with the Orange County Transportation Authority (OCTA) with the award of a US$1.4 million contract to provide traffic signal improvements. The project is part of the renewed Measure M regional traffic signal synchronisation program, which was approved by voters in 2006 for a 30-year extension. Measure M is the half cent sales tax for transportation improvements that was initially approved by Orange County voters in 1990, and was renewed by voters for a 30-year extensi
  • May 27, 2016
    ITS America 2016 San Jose tours programme shows the present and future of ITS
    The major theme of Thursday, June 16, at ITS America 2016 San Jose will be a series of tours that exemplify intelligent transportation at work today and with an eye to the future. The Interstate 80 Integrated Corridor Mobility Project Tour will take in one of the most complex integrated Active Traffic Management systems in the country. This tour includes a stop at the Caltrans TMC in Oakland for an overview of system operations
  • February 3, 2012
    Pioneering new passenger information systems
    Chicago pioneers new passenger information initiatives. By David Crawford