Skip to main content

Iteris awarded transit performance initiative project by San Francisco transit company

Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.
May 31, 2017 Read time: 1 min
Iteris has been awarded a US$934,000 contract for design services by Alameda-Contra Costa Transit (AC Transit) for a corridor travel time improvement project. The project includes the implementation of transit signal priority (TSP), bus stop improvements, real-time passenger information system, and deployment of an adaptive signal control technology system.


This contract continues 73 Iteris’ involvement on 274 AC Transit’s popular Line 97, which spans 12.5 miles along a number of major corridors in the San Francisco Bay Area.

The design phase of the project is under way with deployment anticipated in 2018. Transit signal priority helps to reduce delay and improve schedule reliability for transit operations. Currently the service time for this route is 134 minutes. Once the project improvements are fully deployed, a roundtrip travel time is expected to be reduced by as much as 15 per cent.

UTC

Related Content

  • May 16, 2012
    McCain adaptive signal control reduces congestion on busy San Diego arterial
    McCain has announced results measuring the effectiveness of its adaptive signal control software deployed on the city of San Marcos's new 'smart corridor'. The study revealed the system significantly improved traffic flow on San Marcos Boulevard, the second busiest arterial in San Diego County, California.
  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • January 27, 2012
    Benefits of traffic light synchronisation
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin
  • May 3, 2021
    San Francisco to build 'equitable' public transit
    ConnectSF collaboration seeks projects to ensure sustainable transportation in city