Skip to main content

Indra wins in India with two transport and traffic contracts

Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
November 30, 2015 Read time: 3 mins
509 Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction.

Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with its proprietary Horus solution. This will enable the centralised integrated management of the various intelligent traffic systems (ITS) that will be deployed in the tunnel and ensure compliance with quality and security standards.

The project includes implementation of the automatic incident detection, video surveillance, traffic control, signalling, fire detection, access control and emergency call systems. It will also integrate other sub-systems supplied by local companies, such as lighting, ventilation, communication and energy systems.

Indra's technology will enable the tunnel to be monitored  all times and provide real-time information for decision-making purposes. The high level of automation of operations will facilitate speedy and accurate management of everything that happens in the tunnel, both for routine management purposes and in emergency situations. Indra's solution will also make it possible to offer real-time information to drivers and deliver optimal safety and service quality, helping to reduce the risk of incidents and optimise the use of resources in those situations.

For the second contract, Indra will implement a latest-generation contactless ticketing system to enhance the service and information provided to the more than 18 million residents of Mumbai, simultaneously facilitating the control, financial management and tracking of resources. The company will design, manufacture, engineer, supply and implement the access control and ticketing systems for the new metro line currently under construction in the southeast sector of the city of Mumbai,

Passengers will be able to top up their contactless cards or buy the electronic tokens at any of the 11 stations along the line, either using the automatic dispensing machines or at the customer service/ticket offices at each station. The access control systems will allow users to validate their cards by simply passing them over the scanner, leading to faster and more convenient access.

The solution supplied by Indra will also include portable top-up and inspection devices to allow these processes to be carried out directly on trains and platforms.

Related Content

  • June 24, 2013
    Consortium to develop Spanish ‘smart city’
    A temporary joint venture comprising Indra, Altia, R and Ilux has been awarded the first phase of the Smart Coruña project and will develop the first comprehensive platform for a smart city in the city of A Corũna in Galicia, Spain. The consortium will be responsible for the design, supply, installation and configuration of all the computer equipment and software infrastructure that comprises the Smart Coruña platform. It will also establish the technical project office for the consultancy and supervision o
  • March 23, 2012
    South Korea company wins contracts in Nepal
    The South-Korean company Chungsuk Engineering has been awarded a contract to prepare the DPR for 136 km of the Bardibas-Simara-Birgunj section of the proposed Nepal's East-West electric Railway, writes Ram Krishna Wagle from Nepal.
  • January 30, 2012
    GIS mapping smoothes ITS operations and increases efficiencies
    Alexander Gerschenkron, the famous economic historian, once posited a benefit for those countries which come late to economic development: that they could introduce the latest technology and thus jump over some of the standard development paths followed by their predecessors . It is entirely possible to make the same observation of late-comers to ITS: that they can gain from the pains of those who went before and more easily implement best practice in ITS. As a consequence, it is entirely likely the Abu Dha
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.