Skip to main content

Indra supervises 9km tunnel in Columbia

Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia. Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport. It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions. Indra says its toll solution Mova C
September 3, 2019 Read time: 2 mins

509 Indra and engineering firm Eléctricas de Medellín Ingeniería y Servicios has commissioned a control centre and a back-up centre to supervise a 9km tunnel in Columbia.

Both centres will monitor the safety and revenue collection systems of the Túnel de Oriente, which serves as a transport link between the city of Medellín and José María Córdoba airport.

It is part of Concesión Túnel Aburrá Oriente, a 24km road corridor that Indra is now managing via its Mova solutions.

Indra says its toll solution Mova Collect allows vehicles to travel without stopping at speeds of up to 60km per hour, cutting travel times between Rio Negro airport and Medelin from 45 to 18 minutes.

Additionally, the 7541 Horus tunnel platform is expected to provide operators with information on everything occurring on the highway while variable message signs offer information on road conditions to drivers.

According to Indra, air quality measurement systems and carbon monoxide sensors detect high levels of toxic gases in real-time and activate fans to expel pollutants.

The project also includes the installation of communication systems, safety systems, CCTV, traffic counters, road signage, lighting control and a loudspeaker system.

UTC

Related Content

  • July 19, 2019
    Indra to manage Transurban’s Australian road assets
    Indra is to integrate the management of Transurban Queensland’s road assets in the Australian state into a single control centre. The five-year contract covers the installation of an integrated management system for road assets and three tunnels: Legacy Way (4.6km), Airport Link (6.7km) and Clem7 (4.8km) located in Brisbane, the state capital. The centre is expected to help improve the efficiency and safety of the road network. Indra says its integrated tunnel management platform Horus will centrall
  • October 25, 2017
    Indra wins contract by Highways England for tunnel management technology
    Indra has been awarded a contract from Highways England (HE) to install a Tunnel Management Control System (TMCS) for its tunnel estate as part of a project that foresees the option of implementing the solution in all 13 tunnels managed by HE for €10 million (£8,900,00).
  • December 20, 2013
    Indra wins big in Mexico
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ
  • July 3, 2017
    Indra technology manages the longest tunnel in south-east Asia
    Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.