Skip to main content

Indra wins contract by Highways England for tunnel management technology

Indra has been awarded a contract from Highways England (HE) to install a Tunnel Management Control System (TMCS) for its tunnel estate as part of a project that foresees the option of implementing the solution in all 13 tunnels managed by HE for €10 million (£8,900,00).
October 25, 2017 Read time: 1 min
509 Indra has been awarded a contract from 8101 Highways England (HE) to install a Tunnel Management Control System (TMCS) for its tunnel estate as part of a project that foresees the option of implementing the solution in all 13 tunnels managed by HE for €10 million (£8,900,00).


The tunnel estate will be equipped with Indra’s smart management platform Horus, which will be deployed in the cloud for controlling the infrastructure from any centre.

7541 Horus enables the integrated management of the tunnel's different Intelligent Traffic Systems (ITS) and safety systems, allowing for automated incident management. It provides real-time information and a perspective on everything that occurs in the tunnel, enabling decision-making and operational efficiency; in both routine and emergency situations. In addition, the system aims to reduce the risk of incidents and speeds up management, optimises resource management and offers drivers greater safety and service quality.


The TMCS also permits the integration of multiple tunnels for centralised management using a single interface.

Related Content

  • July 3, 2017
    Indra technology manages the longest tunnel in south-east Asia
    Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.
  • September 2, 2015
    Indra to upgrade Algeria’s Bouïra tunnel
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • November 30, 2015
    Indra wins in India with two transport and traffic contracts
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
  • October 2, 2014
    Mexico implements Indra traffic management technology
    Indra, in partnership with Auneti (Autopista Necaxa-Tihuatlán) and FCC, has deployed traffic management technology in the six tunnels of the new Necaxa-Tihuatlán highway in Mexico. The US$18 million project also includes intelligent transportation systems (ITS) and control and communication systems on the 83 kilometres of highway sections 1 and 2. A new operational control centre equipped with Indra's Horus integrated roadway and tunnel management solution manages traffic along the new road's two sectio