Skip to main content

DDOT releases new Capital Bikeshare locations

Washington’s District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city. DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate
December 24, 2012 Read time: 2 mins
Washington’s 2134 District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city.

DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate, proximity to metro, and proximity to other Bikeshare stations. Residents also ‘voted’ for their preferences using an interactive crowdsourcing map.

“These new locations will mean a 40 per cent increase in the number of CaBi stations in DC,” said DDOT Director Terry Bellamy. “Combined with new stations in Arlington, Alexandria and soon in Montgomery County, we’re building a robust and truly regional system.”

The proposed stations are in a mix and new and existing bikeshare neighbourhoods. “We need to balance the desire to expand into new areas with the need for more docks and bikes in existing areas, particularly downtown, where demand is heaviest.” said Chris Holben, DDOT Project Manager for Capital Bikeshare. “Basically, for every ‘expansion’ station we also need more spaces downtown to keep up with demand.”
DDOT plans to start installing new stations and bikes in January and finish in March. Locations not selected in this round will be considered for the next round.

For more information on companies in this article

Related Content

  • A new way to manage parking demand
    July 21, 2021
    Parking permit changes at one US campus could provide a model for encouraging active travel options post-Covid – and for transit ticketing adjustments as commuting patterns change
  • New river crossings vital for east London
    October 14, 2014
    With the capital’s population forecast to grow to 10 million people by 2030, and with much of this growth due to take place in east London, demand for crossing the river will increase. Unless new river crossings are provided in east London, the overall growth of this part of London will be affected and its economic potential will not be fully realised. The Silvertown tunnel is a key part of the plans and is now progressing to the next stage with a consultation that starts on 15 October on detailed propos
  • IRD wins $5.7m WiM upgrade contract with District of Columbia
    June 23, 2023
    DDoT deal will see new features added to three legacy WiM systems in DC
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.