Skip to main content

DDOT releases new Capital Bikeshare locations

Washington’s District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city. DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate
December 24, 2012 Read time: 2 mins
Washington’s 2134 District Department of Transportation (DDOT) has announced proposed locations for fifty-four new Capital Bikeshare (CaBi) stations to be installed this winter in the District of Columbia. The list includes proposed new stations in all eight wards of the city.

DDOT selected the locations from a longer list of suggested locations submitted by the public over the past two years. DDOT evaluated the locations using several criteria, including population density, employment density, bike-to-work rate, proximity to metro, and proximity to other Bikeshare stations. Residents also ‘voted’ for their preferences using an interactive crowdsourcing map.

“These new locations will mean a 40 per cent increase in the number of CaBi stations in DC,” said DDOT Director Terry Bellamy. “Combined with new stations in Arlington, Alexandria and soon in Montgomery County, we’re building a robust and truly regional system.”

The proposed stations are in a mix and new and existing bikeshare neighbourhoods. “We need to balance the desire to expand into new areas with the need for more docks and bikes in existing areas, particularly downtown, where demand is heaviest.” said Chris Holben, DDOT Project Manager for Capital Bikeshare. “Basically, for every ‘expansion’ station we also need more spaces downtown to keep up with demand.”
DDOT plans to start installing new stations and bikes in January and finish in March. Locations not selected in this round will be considered for the next round.

For more information on companies in this article

Related Content

  • Road user charging potential solution to transportation problems
    December 14, 2012
    A number of new and highly significant open road tolling schemes have just been launched or are soon to ‘go live’. Systems of road user charging are flexing their muscles as the means to solve politically sensitive transportation problems, reports Jon Masters. Gothenburg, January 2013, will be the time and place for the launch of the next city congestion charging scheme in Europe. In a separate development, Los Angeles County’s tolled Metro ExpressLanes began operating in November 2012 – the latest in a ser
  • Greenowl brings bespoke traveller information one step closer
    June 4, 2015
    Greenowl’s voice-only congestion warning smartphone app alerts drivers to problems ahead and could be the way ahead for traffic information. If there is one point Matt Man, CEO of Canadian company Greenowl, wants to make clear from the start, it is that his company’s app is not a navigation system. He says: “Our system does not direct drivers to their destination because we mainly focus on commuters who know how to get to where they are going and only need information about any delays and incidents ahead of
  • Australia's ground breaking average speed enforcement
    February 1, 2012
    The speed enforcement system on the Hume Highway in Australia combines both spot and point-to-point solutions. Here, Redflex's Peter Whyte discusses its implementation. The Australian State of Victoria has achieved notable success in reducing casualty rates since launching a three-pronged road accident prevention initiative in the late-1980s.
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.