Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

For more information on companies in this article

Related Content

  • FHWA collaborative framework on automated driving systems: an explainer
    September 26, 2023
    USDoT FHWA has put together a collaborative framework to help secure the roll-out of automated driving systems in the US. John Harding of FHWA explains the thinking…
  • Opinion: Infrastructure Act falls short
    December 16, 2021
    The Infrastructure Investment & Jobs Act has been passed, garnering applause across the political spectrum – but not everyone is excited. Scott Shepard of Iomob explains his concerns, and points to some unwelcome parallels with the recent Cop26 climate conference
  • ARTBA proposes path to breaking gridlock on transportation funding
    March 13, 2015
    The American Road & Transportation Builders Association (ARTBA) has outlined a detailed proposal it believes could end the political impasse over how to fund future federal investments in state highway, bridge and transit capital projects. The ‘Getting beyond gridlock’ plan would marry a 15 cents-per-gallon increase in the federal gas and diesel motor fuels tax with a 100 per cent offsetting federal tax rebate for middle and lower income Americans for six years. The plan, ARTBA says, would fund a US$401 bil
  • Commercial vehicle cross-border enforcement needs muscle
    February 3, 2012
    A look at the current status of cross-border enforcement of commercial vehicle operation in the European Union and a look at what still needs to happen to realise a coherent working system