Skip to main content

Colorado statewide transit integration plan gets rolling

Hoping to lay the groundwork for a future integrated system across the state, Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service. With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector ope
June 5, 2013 Read time: 2 mins
Hoping to lay the groundwork for a future integrated system across the state, 5701 Colorado Department of Transportation (CDOT) officials launched its first comprehensive transit plan that will attempt to create a complete picture of existing local systems, future needs and gaps in service.
 
With no funding available to create a complete statewide transit system, transportation leaders are instead working towards integration among the existing local and regional systems, possibly with a CDOT-managed connector operation that would provide links between them.

The transit plan, expected to take up to eighteen months to complete, is a first step, intended to be an inventory of existing transit options across the state and an analysis of what else riders need. It will also set out policies backing programs that make transit more available and attractive to travellers and more time-competitive with cars, according to a CDOT statement on the plan.

“It’s really working in each area of the state to look at what each of those systems’ needs are and how that integrates into a whole statewide picture,” CDOT project manager Tracey MacDonald said. “It’s a new endeavour.”

The plan is the second step in the creation of a transit and rail element of the State Transportation Plan. In March 2012, officials adopted a Freight and Passenger Rail Plan, which called for investment in a now-under way Advanced Guideway System feasibility study and, depending on the outcome of the study, a high-speed rail between Denver and Eagle County.

For more information on companies in this article

Related Content

  • Hyperloop feasibility study confirmed for Kansas City
    February 2, 2018
    Black Veatch in partnership with Virgin Hyperloop One (VHO) and the University of Missouri System will conduct a feasibility study of an ultra-high-speed hyperloop route along I-70 in the state on behalf of The Missouri Hyperloop Coalition. The proposed route would connect a combined five million residents in Kansas City, Columbia and St. Louis with a journey time under 30-minutes. The study will analyse the technical alignment as well as the potential economic impact and benefits of integrating hyperloop
  • IBTTA: road user charge is the future
    March 16, 2022
    The US government’s cash injection for the nation’s bridges represents a step forward – but IBTTA’s Pat Jones suggests that states need to consider the benefits of road usage charging
  • Authorities look to MaaS for new solutions and cost savings
    July 18, 2017
    The structure of society and the way in which our cities work will be completely transformed by Mobility as a Service (MaaS), Finland’s minister of transport and communications Anne Berner, told ITS International’s recent MaaS Market conference 2017 in London. In her keynote address, Berner told a packed audience of more than 200 ITS professionals that MaaS has the potential to help governments around the world meet their big city targets such as the rate of employment, the environment, the efficient use of
  • Planners must 'unhook' people from cars
    October 23, 2020
    Transport policies should provide route map to carbon net zero by 2050, says TPS