Skip to main content

Balfour to deliver Bay Street corridor project 

Balfour partners include Superior Construction, Stantec and Miller Electric
September 17, 2021 Read time: 1 min
Balfour and its partners will oversee 60% of the design of the Bay Street Innovation Corridor (image credit: Jacksonville Transportation Authority)

Balfour Beatty is to deliver the Bay Street Innovation Corridor project for the Jacksonville Transportation Authority (JTA) in Florida as part of a $44 million deal.

The project marks the first phase of the JTA's Ultimate Urban Circulator autonomous vehicle service – a new automated people mover system for Downtown Jacksonville and its surrounding neighbourhoods.

Once complete, the three-phase Ultimate Urban Circulator will expand Jacksonville’s current skyway from two and a half miles to ten miles.

The skyway is an elevated monorail system that operates above the streets of Downtown Jacksonville, crossing the St. Johns River to Kings Avenue on the Southbank.

JTA CEO Nathaniel P. Ford Sr says: “This award represents a major milestone for the Ultimate Urban Circulator, the Jacksonville Transportation Authority and Downtown Jacksonville. We are confident the Balfour Beatty team and its partners will deliver a world-class project on behalf of the taxpayers of Jacksonville, placing our community at the forefront of innovation.”

Balfour and its partners will oversee 60% of the design of the corridor as well as utilising integrated progressive design build methods.

These partners include Superior Construction Company Southeast, Beep, WGI, Stantec Consulting Services and Miller Electric.
 

For more information on companies in this article

Related Content

  • Kapsch tunnels into US and Brazil
    April 21, 2025
    Projects in Florianópolis & Fort Lauderdale completed - and Hawaii awarded
  • Oxa joins Sunderland AV shuttle programme
    January 20, 2025
    UK city initiative aims to show how AVs can connect people to key destinations
  • Denver light rail contract awarded
    July 31, 2015
    Denver’s Regional Transportation District (RTD) Board of Directors has approved a US$140 million two-phased contract award to Balfour Beatty Infrastructure (BBII) to design and build the Southeast Rail Extension. Design will begin during the fall with construction expected to start in spring 2016. The Southeast Rail Extension will build an additional 2.3 miles of light rail on the existing Southeast Rail Line south of Lincoln. When complete it will include an end-of-line station at RidgeGate Parkway,
  • Fluor JV to build Texas expressway
    June 1, 2015
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst