Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Driver training saves lives, increases profits, reduces costs
    February 3, 2012
    An innovative UK Government initiative on work-related driver training has resulted in astonishing success, not only in terms of government objectives, but also in substantial cost-benefits for companies and public sector authorities participating in the scheme: they save lives and increase profits/reduce costs Here, we present an overview of the initiative and, overleaf, provide a detailed cost-benefit analysis which amply illustrates why it has been enthusiastically embraced by industry and the public sec
  • Driver training saves lives, increases profits, reduces costs
    February 6, 2012
    An innovative UK Government initiative on work-related driver training has resulted in astonishing success, not only in terms of government objectives, but also in substantial cost-benefits for companies and public sector authorities participating in the scheme: they save lives and increase profits/reduce costs Here, we present an overview of the initiative and, overleaf, provide a detailed cost-benefit analysis which amply illustrates why it has been enthusiastically embraced by industry and the public sec
  • Balfour Beatty and Mott MacDonald secure contract expansion for Area 10
    October 17, 2017
    Highways England has awarded a £115 million ($152 million) asset support contract extension of 17 months to Balfour Beatty and Mott MacDonald to continue its service delivery for Area 10; covering Merseyside, Cheshire, Lancashire and Greater Manchester. The contract will run from November 2017 to March 2019. The current asset support contract delivers a range of service delivery and maintenance activities such as 24/7 incident response, to ensuring the safe operation of the 570km of the road network.
  • Radar effective as detection tool for hard shoulder running
    July 23, 2012
    Navtech Radar's millimetric-wave systems are being researched on the M42 in England to look into how this type of detector can assist in the opening of the hard shoulder as an additional running lane. Here, the company's Stephen Clark talks about the technology being used. In England, the Highways Agency's (the HA, an executive agency of the Department for Transport) Managed Motorways system - formerly called Active Traffic Management - uses electronic signs and signals mounted on gantries to direct drivers