Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Asecap Days 2025: 'Vision Zero is not a number, it’s about a culture'
    May 29, 2025
    Saving lives and saving road infrastructure were two of the topics at the second and last day of the annual conference of Asecap, the European road tolling association, in Spanish capital Madrid
  • New river crossings vital for east London
    October 14, 2014
    With the capital’s population forecast to grow to 10 million people by 2030, and with much of this growth due to take place in east London, demand for crossing the river will increase. Unless new river crossings are provided in east London, the overall growth of this part of London will be affected and its economic potential will not be fully realised. The Silvertown tunnel is a key part of the plans and is now progressing to the next stage with a consultation that starts on 15 October on detailed propos
  • Georgia Yexley: Here's how micromobility can deliver public good
    June 27, 2023
    Georgia Yexley, founder of Loud Mobility, looks at the lessons on diversity, equity and inclusion which can be learned from the US and wider – and explores why it is a vital component for industry growth in the UK
  • Essex Highways improves street lighting
    February 22, 2013
    Internet hosted street lighting software from Mayrise Systems is helping Essex Highways, a strategic partnership between the UK's Essex County Council and Ringway Jacobs, to ensure street lights are working, in order to maintain a safe environment for both road users and pedestrians. Mayrise for Street Lighting Online is core to all the activities carried out by the Essex highways street lighting team; it allows for the accurate capture of technical data in the field and delivers this information in an easy