Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Case study highlights model-practices for highway security
    October 8, 2015
    A US$229 million Costain construction site along 14 kilometres of highway has provided material for a model-practice case study issued by UK-based security solution provider VPS Site Security. The Heads of Valleys road follows the southern boundary of the Brecon Beacons National Park in South Wales and is undergoing a major improvements scheme. It presents a significant engineering and environmental challenge to secure safely, including heavy traffic, remote and difficult terrains with numerous access po
  • 780 SolarLite road studs deployed on UK motorway accident black spot
    July 11, 2012
    An unlit stretch of the M42 motorway in the UK, identified as an accident black spot area due to the lack of street lighting linked to increased accident rates, has seen the installation of 780 Astucia SolarLite road studs. The studs, along the carriageway of the M42 from junctions 1 to 3a, give drivers up to 900 metres visibility of the road layout ahead, which is up to ten times greater than would be possible from traditional retro-reflective ‘cats eye’ road studs. In addition, the existing two metre whi
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • Smarter transport remains key to smart cities
    January 9, 2018
    Colin Sowman looks at some of the challenges and solutions that will provide enhanced transport efficiency in tomorrow’s smarter cities. However you define a ‘smart city’, one of the key ingredients will be an efficient transport system. As most governments and city authorities face financial constraints, incremental improvements in the existing systems is the most likely way forward. In London, new trains and signalling are improving the capacity of the Underground but that then reveals previously