Skip to main content

Improved safety information in M55 signs upgrade

A US$567,000 (£450,000) Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed. Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6. The new signs will allow Highways England traffic officers at the North West Re
December 12, 2016 Read time: 2 mins
A US$567,000 (£450,000) 8101 Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed.

Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6.

The new signs will allow Highways England traffic officers at the North West Regional Control Centre at Newton-le-Willows and colleagues at the National Traffic Operation Centre in Birmingham, to give clearer information – with the internationally-recognised symbols helping to warn drivers of dangers ahead including accidents, congestion, snow and ice, high winds or an increased skid risk.

The signs will operate traditionally, using only text messaging, until the spring when a programmed national software update will take place, allowing pictograms to be used as well.

Related Content

  • December 9, 2016
    Four drivers a month deliberately ignore Manchester motorway closures
    Highways England is urging drivers Highways England is not to put road workers’ lives at risk by deliberately ignoring road closures on the M60 and M62 near Manchester. New figures have revealed that four drivers a month are entering closed sections of road in the Manchester smart motorway scheme to either overtake traffic on the motorway or avoid using diversion routes. Highways England has released CCTV footage showing a driver ignoring an overnight slip road closure at junction 11 of the M60 at Ecc
  • December 5, 2018
    England’s first motorway celebrates 60th birthday with ITS upgrade
    Sixty years today, 2,300 drivers drove along an eight-mile section of road in England – the first motorway in the country. Opened in 1958, the Preston bypass – now part of the M6 - only had two lanes in each direction, with no safety barrier in the central reservation. There was also no technology – not even simple electronic signs. Highways England is pledging to celebrate the birthday by completing four upgrades on the M6 by spring 2022. The £900m project will add extra lanes and better technolog
  • September 7, 2021
    How ITS weathers the storm on I-80
    Weather-related closures on Wyoming’s I-80 can cost as much as $11.7m each. But a new initiative is harnessing V2X technology to prevent snow shutting things down
  • May 31, 2013
    Temporary traffic monitoring with Bluetooth and wi-fi
    David Crawford reviews developments in temporary ITS. Widespread take-up of technologies such as Bluetooth and wi-fi are encouraging the emergence of more sophisticated, while still cost effective, ITS responses to the traffic issues posed by temporary road situations such as work zones and special events. Andy Graham of traffic solutions specialists White Willow Consulting says: “A machine-to-machine radio link is far easier and cheaper than reading characters on a plate.” There can be other plusses. Tech