Skip to main content

Improved safety information in M55 signs upgrade

A US$567,000 (£450,000) Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed. Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6. The new signs will allow Highways England traffic officers at the North West Re
December 12, 2016 Read time: 2 mins
A US$567,000 (£450,000) 8101 Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed.

Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6.

The new signs will allow Highways England traffic officers at the North West Regional Control Centre at Newton-le-Willows and colleagues at the National Traffic Operation Centre in Birmingham, to give clearer information – with the internationally-recognised symbols helping to warn drivers of dangers ahead including accidents, congestion, snow and ice, high winds or an increased skid risk.

The signs will operate traditionally, using only text messaging, until the spring when a programmed national software update will take place, allowing pictograms to be used as well.

Related Content

  • February 2, 2016
    Smarter motorway for West Yorkshire
    Drivers on the M1 near Wakefield will benefit from reduced congestion and improved journey times after the final phase of a new US$172 million smart motorway went live. The Highways England scheme along a seven-mile stretch of motorway between junction 39 and junction 42 is the first all lane running motorway in the north, where the hard shoulder has been permanently converted to an extra lane. The smart motorway uses the latest technology to monitor traffic levels and variable speed limits on overhea
  • July 22, 2015
    Balfour Beatty JV to deliver UK smart motorways package
    The Balfour Beatty Vinci joint venture has been awarded a contract by Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme. The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshir
  • August 12, 2015
    Dynamic Message Signs : Don’t replace, refurbish and upgrade
    Refurbishing old dynamic message signs can save money and increase technical capabilities as David Crawford discovers. Evidence is growing on both sides of the Atlantic of the scope for retrofitting old or technically out-of-date dynamic message signs (DMS) with new electronic equipment, to save on the costs of installing full-scale replacements. In the last four months of 2014, a number of US states progressed programmes that achieved savings of more than US$1.75 million (€1.56million).
  • January 31, 2012
    Slow adoption of European VMS harmonisation
    Alberto Arbaiza, ES4-Mare Nostrum Chair, Directorate General of Traffic, Spain and Antonio Lucas-Alba, ES4 Secretariat, INTRAS, University of Valencia, Spain write about progress towards variable message sign harmonisation in Europe . Particularly in Europe, national road administrations have been faster at generating and adopting new road signs than the standardisation process has been at generating them.