Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

For more information on companies in this article

Related Content

  • Pedestrian and cycle counters installed across Aberdeen
    October 25, 2016
    Pedestrian and cycle counters have been installed around Aberdeen, Scotland to accurately monitor numbers of people using pavements and cycleways. The equipment, from UK company Traffic Technology, includes 13 Eco Multi counters which have been installed beside strategic pavements, which include off-road paths, dual-use pavements and segregated routes and are on paths which connect residential areas to schools, employment areas, parks and riversides. Some of the counters, which distinguish between ped
  • Indra brings in Citilog for Silvertown Tunnel incident detection
    June 27, 2024
    System will help reduce congestion in and around tunnel under River Thames in London
  • TfL launches LoCITY project to cut urban emissions from road freight
    February 1, 2016
    Transport for London (TfL) has launched a new five-year industry-led programme to reduce the emissions of London's freight and fleet operators. The programme will work across the industry to increase the availability and uptake of low emission vans and lorries. It will bring together freight and fleet operators, vehicle manufacturers, fuel providers and the public sector. TfL says that 85 per cent of London's goods are transported by road and that freight makes up 17 per cent of London's road traffic.
  • Cross border enforcement a logical step
    January 30, 2012
    The logic supporting a cross-border enforcement Directive for the European Union (EU) is both detailed and compelling. The White Paper on European transport policy published in 2001 included the ambitious objective of reducing by 50 per cent by 2010 the number of people killed on the roads of the EU. But since 2005 the reduction in the number of road deaths has been slowing down: overall, the period from 2001 until 2009 saw the number of fatalities decrease by 36 per cent. According to Community indicators,