Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

For more information on companies in this article

Related Content

  • Jacobs WSP/Parsons Brinckerhoff JV wins engineering excellence award
    October 13, 2016
    The work of a Jacobs WSP/Parsons Brinckerhoff design joint venture on the North Strathfield Rail Underpass (NSRU) in New South Wales has been awarded an Australian Engineering Excellence Award (AEEA), which recognises outstanding achievement in the practice of engineering and service to the profession. The NSRU project was part of the Northern Sydney Freight Corridor Program, a joint Australian and NSW Government initiative to improve the capacity and reliability of freight trains between Strathfield an
  • WSP/Parsons Brinckerhoff to manage California HOV project
    October 28, 2016
    The Contra Costa Transportation Authority in California, US, has awarded a contract to WSP/Parsons Brinckerhoff for construction management services for the completion of the I-680 HOV (high-occupancy vehicle) Express Lanes project. The Authority, in cooperation with the California Department of Transportation, Metropolitan Transportation Commission, and the Federal Highway Administration, seeks to improve traffic operations and relieve congestion with the construction of HOV express lanes on southbound
  • Taking tolling towards new opportunities
    May 18, 2016
    Vinci’s André Broto presented his views on how the tolling industry could play an important role in helping authorities ease urban congestion, to delegates at the IBTTA conference. As director of foresight and strategy at Vinci Autoroutes, France, André Broto has been spending some time considering the future of tolling in his own country and worldwide. He presented his thoughts, which include a very different angle of the causes of, and solutions to, congestion at the IBTTA’s (International Bridge, Tunnel
  • China invests in transportation infrastructure
    February 19, 2014
    Construction of the 26.4- kilometre Jinan-Changqing line of the Jinan-Liaocheng railway in China will begin during March 2014. The project includes nine stations and will cost US$2.18 billion in total, out of which US$202 million is scheduled to be invested in 2014. Meanwhile, two cross-river bridge construction projects will be kicked off in Jinan in May 2014. They include a dual-use bridge across the Yellow River that will cost US$262 million and the 13.5- kilometre Changqing Yellow River bridge, which