Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

For more information on companies in this article

Related Content

  • Toll option for new Cape Fear bridge
    June 6, 2025
    North Carolina councillors voted to leave option open for proposed structure
  • IBTTA, ITS America applaud long term FAST Act
    December 2, 2015
    The International Bridge, Toll and Turnpike Association (IBTTA) and ITS America have applauded Congressional committee members on reaching agreement on a long-term surface transportation bill.
  • TransCore to implement AET for New York bridges and tunnels
    November 1, 2016
    New York City’s Metropolitan Transportation Authority (MTA) has selected TransCore to convert all nine of its bridges and tunnels to all-electronic tolling (AET). Under an accelerated roll-out schedule, TransCore will finish converting the first three facilities by January 2017. The remaining conversions will be completed by November 2017. Governor Andrew M. Cuomo first announced the New York Crossings Project in October, as a broad initiative to reduce traffic congestion and decrease vehicle emissions
  • FCC consortium to build Colombia tunnel project
    November 2, 2015
    A consortium led by Spanish company FCC has been awarded a contract for the Toyo tunnel project, including design, construction, operation and maintenance of the tunnel in the Urabá Port, around 80 kilometres from Medellín, Colombia. The US$432 million project, which is expected to take ten years to complete, is located between the municipalities of Giraldo and Cañasgordas, around 500 kilometres north-west of Bogotá. It includes the building of a completely new road section, 41 kilometres long with one