Skip to main content

Brisbane expressway opens to traffic

The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026. Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity
July 13, 2015 Read time: 2 mins
The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026.

Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity joint venture, which awarded 7319 Egis a ten-year contract for operation and maintenance to.

The project includes two separate parallel road tunnels, one for the eastbound traffic and one for the westbound traffic, each with two lane carriageways and connected by cross passages every 120 metres without lay-bys or breakdown bays. It also includes tunnel portals on the Western Freeway at Toowong and the Inner City Bypass at Kelvin Grove, along with the tunnel management system, fire safety, mechanical and electrical systems, ventilation systems, adaptation of existing roads to connect the tunnels to the existing network and a free flow electronic tolling system, which is not part of the contract.

Related Content

  • April 16, 2014
    Flagship French motorway inaugurated
    The inauguration of the French Landes A63 motorway marked the culmination of 27 months of major works carried out adjacent to traffic by the economic interest group GIE A63. The road concessionaire, Atlandes, of which Egis is a shareholder, had awarded the construction contract to GIE A63, which then hired Egis for the turnkey integration of fixed and operational equipment and an 80 per cent share of the engineering, procurement and construction management. Atlandes also awarded Egis the subsequent operati
  • June 1, 2015
    Fluor JV to build Texas expressway
    A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
  • November 13, 2012
    Traffic to flow freely over world’s widest bridge
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • August 20, 2015
    European tunnel upgrades following new safety legislation
    Across Europe there is a very mixed picture of compliance to latest safety standards for road tunnels. Best practice has emerged, however, in the wake of European legislation. Jon Masters reports High profile fatal fires following accidents in the Mont Blanc, Tauern and Gotthard tunnels prompted the 2004 European Union Directive 2004/54 on road tunnel safety. This meant all EU member states would have to meet new standards of safety in road tunnels by 30 April 2014. The Directive applied to all tunnels over